TY96/96A and TY97/97A VHF Radio Installation Manual
26 September 2018
01238-00
Issue AJ
______________________
Page 22
Trig Avionics Limited
7.
Post Installation Checks
Post installation checks should be carried out in accordance with your certification requirements.
These checks should include:
•
Receiver operation. Tune a local station and check that the reception is clear and
understandable.
•
Transmitter operation and microphone gain adjustment. Contact a local station and check that
they are receiving you clearly.
•
Interference check. Check the radio with other avionics and electrical equipment on the
aircraft operating. Check at low, mid and high radio frequencies. There should be no
significant interference on reception, and when the TY96/TY97 transmits there should be no
adverse effect on any other equipment.
•
Sidetone adjustment. During the transmit checks, verify the sidetone level is set appropriately.
•
Intercom adjustment. If the intercom function is being used, set the listening level and squelch
appropriately. Note that the squelch is best adjusted in the normal ambient noise environment,
for example with the engine(s) running and developing power.
Содержание TY96
Страница 2: ...This page intentionally left blank ...
Страница 6: ......