TriangleTube PRESTIGE Excellence PSRKIT01 Скачать руководство пользователя страница 7

PRESTIGE Excellence

HX Field Replacement

Kit 

7

Installation of New Heat Exchanger

Prior to installation of the new heat exchanger,

carefully check the interior of the boiler cabinet.

Dry the cabinet / insulation when signs of mois-

ture are present.  Check integrity of all wiring.

Repair / replace when necessary.  

1. Lift new heat exchanger into place by engaging

the rear HX brackets (top and bottom) into the

rear boiler jacket panel provisions. 

Installation of Blower/Gas Valve/Venturi Assembly

1. Mount  the  blower/gas  valve/venturi  assembly

on  top  of  the  heat  exchanger.    Use  the  new

blower gasket provided in the kit. Install 4 new

blower  mounting  screws  (M4  x  12)  ensuring

they  are  properly  tightened  and  the  blower  is

mounted securely to the burner plate (Fig. 9).

See Table 2, page 14 for torque specifications.

Installation of Water Connection

1. Connect boiler return piping back to return con-

nection of new heat exchanger.  Use a new boiler

piping  gasket  provided  in  the  kit  between  heat

exchanger and return pipe.  Tighten the brass union

nut ensuring a leak tight seal.

2.  Rotate the boiler supply piping back into position

and connect to the supply connection of the new

heat exchanger.  Use a new boiler piping gasket

provided  in  the  kit  between  heat  exchanger  and

supply pipe.  Tighten the brass union nut ensuring

a leak tight seal.

Use care when tightening the heat exchanger union

nuts.  If excessive torque is applied to the union nut,

damage can occur to the boiler piping or the gasket

seal resulting in leakage.

3.    Install  the  internal  circulator  and  diverter  valve

assembly in the boiler using a new flange gasket

between  the  circulator  flange  and  boiler  piping

flange.  Tighten the flange nuts and bolts to secure

the flange connection.  Ensure the flange gasket is

not pinched between the flanges.

4.  Connect the CH supply pipe to the bottom of the

diverter valve by tightening the brass union nut by

hand.

5.  Install the DHW tank boiler piping using a new

boiler piping gasket provided in the kit between the

piping and the DHW tank.  Tighten the brass union

on the boiler piping at the top of the DHW tank by

hand.  Tighten the brass union nut at the diverter

valve by hand.

6.   After all piping is connected, tighten all connec-

tions using the two wrench method.

7.  Connect  the  Molex  plug  to  the  diverter  valve

actuator and the electrical wiring to the internal

circulator.

NOTICE

NOTICE

2

4

3

1

1. Gas Valve

2. Venturi

3. “Straight” Gas Valve Fitting

4. Blower

Fig. 9:  Prestige Burner Assembly

Содержание PRESTIGE Excellence PSRKIT01

Страница 1: ...1 PSRKIT01 Heat Exchanger Assembly X 1 PTRKIT124 Heat Exchanger Assembly X 1 PSRKIT76 Heat Exchanger Assembly X 1 PTRKIT125 Heat Exchanger Assembly X Indicates a potentially hazardous situation which...

Страница 2: ...Attach a hose to external boiler drain Place other end of this hose to a suitable drain 8 Open external boiler drain valve and begin draining the boiler To assist in the draining of the boiler remove...

Страница 3: ...d from the boiler it should be inspected for deformation damage or corrosion If there are any signs of deformation damage or corrosion on the vent outlet adapter replace it immediately Check condition...

Страница 4: ...ated at the top of the heat exchanger 10 Disconnect the blue wire leads from return tem perature sensor Shown as item 4 in Fig 1 located at the bottom of the heat exchanger 11 Disconnect the orange wi...

Страница 5: ...hillips Torx head screw driver provided in the kit and remove the blower gas valve venturi Gas valve and ven turi assembly can remain connected to the blower housing Discard old blower gasket Fig 5 Re...

Страница 6: ...avoid vertical motion of the heat exchanger during transport and is not required to be installed with the replacement heat exchanger 2 Lift the heat exchanger about 4 to 6 to disen gage from the rear...

Страница 7: ...ly connection of the new heat exchanger Use a new boiler piping gasket provided in the kit between heat exchanger and supply pipe Tighten the brass union nut ensuring a leak tight seal Use care when t...

Страница 8: ...le Connect the condensate drain assembly to the retaining nut and tighten Ensure the condensate drain assembly contains the plastic seated ball Do not install the conden sate drain assembly if the bal...

Страница 9: ...and the gasket is reseated in the adapter Failure to comply could result in leakage of flue prod ucts into the surrounding area resulting in death or personal injury Installation of Polypropylene Vent...

Страница 10: ...erature sensor wires of the boiler wiring harness using the included Wire Taps Follow the Harness Adapter instructions above then plug the Harness Adapter into the supply tem perature sensor 4 Reconne...

Страница 11: ...8 Connect ignition cable to the TriMax control module and install rear control box cover 9 Install the air intake pipe back on the venturi air inlet connection Make sure the ignition cable is secured...

Страница 12: ...ents must be performed with calibrated equip ment to ensure proper readings and accuracy Failure to perform a complete combustion test at both high and low input rates may result in incom plete combus...

Страница 13: ...enter the access code 3 Press the RIGHT button to highlight the Manual Operation icon then press the OK button 4 Press the OK button while the FAN icon is highlighted to manually fire the burner and...

Страница 14: ...the plastic OFFSET SCREW see Fig 14 using a T 40 Torx wrench as follows Counter clockwise adjustment of OFFSET SCREW at Low Fire 1 firing rate O2 increases and CO2 decreases Clockwise adjustment of OF...

Отзывы: