
21
FIG 22
2358 & 2359 HORIZONTAL BALANCED FLUE KIT DETAILS
HOLE REQUIRED 130mm DIAMETER
THROUGH WALL TO TAKE TERMINAL
IMPORTANT:
WHEN INSTALLING THE FLUE SYSTEM, IT IS
ESSENTIAL THAT THE FLUE INCLINES SLIGHTLY
FROM THE BOILER. THIS WILL ALLOW
ANY CONDENSATION WHICH FORMS IN THE FLUE TO
RUN BACK TO THE CONDENSATE DRAIN
Содержание Contractor WM70 HE INTERNAL
Страница 8: ...8 FIG 3 OUTLINE DIMENSIONS 3 TECHNICAL INFORMATION ALL DIMENSIONS IN mm FIG 4 PIPEWORK CONNECTIONS...
Страница 14: ...14 FIG 14 SINGLE PIPE SUPPLY...
Страница 15: ...15 FIG 15 TWO PIPE SUPPLY...
Страница 22: ...22 FIG 23 2355 2356 Horizontal Balanced Flue to be used in conjunction with 2357 High Level Adaptor Kit only...
Страница 24: ...24 FIG 25 2357 HIGH LEVEL ADAPTOR KIT USED IN CONJUNCTION WITH 2355 AND 2356 FLUE KITS ONLY...
Страница 27: ...27 FIG 26 VERTICAL BALANCED FLUE KIT 2360...
Страница 35: ...35...