OIL SUPPLY (cont.)
Notes:
1. The pump suction should not exceed 0.4bar, as dissolved
gas may be released from the oil, affecting combustion.
2. The return pipe must end at the same level as the suction
outlet to prevent loss of prime.
3. The outlet from the tank should be approximately 75mm
(3”) above the bottom to prevent sediment and water
being drawn into the supply line.
Single-Pipe Oil Supply with De-aerator (fig 13)
Where a two-pipe suction lift is required, but the return pipe
requirement is too long, or impractical to run, an oil de-aerator
can be used. The burner should be piped as for a two-pipe
system, up until the de-aerator, when a single pipe can be
taken the remaining distance to the storage tank. The de-
aerator should be fitted at the closest point to the boiler,
externally to the dwelling.
A non-return valve is not required with this system. The pump
is supplied ready for fitting to an oil de-aeration device.
FIG 13
INSTALLATION WITH OIL DE-AERATOR
Содержание Contractor WM70 HE INTERNAL
Страница 8: ...8 FIG 3 OUTLINE DIMENSIONS 3 TECHNICAL INFORMATION ALL DIMENSIONS IN mm FIG 4 PIPEWORK CONNECTIONS...
Страница 14: ...14 FIG 14 SINGLE PIPE SUPPLY...
Страница 15: ...15 FIG 15 TWO PIPE SUPPLY...
Страница 22: ...22 FIG 23 2355 2356 Horizontal Balanced Flue to be used in conjunction with 2357 High Level Adaptor Kit only...
Страница 24: ...24 FIG 25 2357 HIGH LEVEL ADAPTOR KIT USED IN CONJUNCTION WITH 2355 AND 2356 FLUE KITS ONLY...
Страница 27: ...27 FIG 26 VERTICAL BALANCED FLUE KIT 2360...
Страница 35: ...35...