Trianco Contractor WM 70 Скачать руководство пользователя страница 9

Boiler Models 

W M   7 0

Factory set at 

Rated Input

(Btu/h) 

77,800

66,666 

(kW) 22.8  19.5

Rated Output 

(Btu/h)

70,000

60,000 

(kW) 20.5

17.5 

Burner 

Model

Ecoflam Minor 1 

Weight (empty) 

(kg)

83

(lb) 

183                

Water content 

(litre)

14.5

(gal)

3.2

Flow & return sockets 

22mm Compression

Flue Gas Temp. 

°C

225

205 

Max. operating pressure 

(bar)

4,5 

(psi)

43.5 

Test Pressure 

(bar) 

4.5

(psi) 65.3 

Water side resistance
10° diff (mbar)

23.0

(in. w.g.)

9.2

20° diff (mbar)

6.4

(in. w.g.)

2.5

Starting Current

(amp)

3.5 

Running Current

(amp)

0.77 

Control Thermostat 

- Adjustable up to 82° C

Limit Thermostat 

- Factory set at 110° C -6 °C (hand reset)

Flue Type

- Balanced Flue

Thermal Insulation  

-  Insulated with fibre glass

5

3. TECHNICAL SPECIFICATION

exhaust noise, so care should be taken 
when siting adjacent to neighbouring 
property.

Clearance and Service Access

When siting the boiler, ensure adequate
clearance is allowed for making water and
flue connections, as the boiler can be fully
serviced from the front. 

Unpacking the Boiler

(a) Cut through straps and remove 

carton

(b) Remove the front door, remove 

pack of parts, lift outer casing from 
boiler and move to a safe place to 
avoid damaging.

(c) Remove securing screws fixing boiler

to pallet.

(d) The boiler can now be removed 

from pallet

In the interest of safety, the boiler should be
commissioned by an OFTEC trained and
registered engineer.

A useful guide to ‘Safe Working Practices for
Oil Firing Technicians’ is published by
OFTEC.

ELECTRICAL WORK SHOULD BE CARRIED
OUT BY A QUALIFIED ELECTRICAL 
ENGINEER

Siting the Boiler

Sound Levels

The following aspects should be considered
before installation:

(a)  Some people are particularly sensitive to

even low noise levels so this aspect
should be discussed with the householder.

(b)  Small rooms tend to amplify noise, 

particularly if the wall construction is 
hollow or the surface tiled.

(c)  A chimney passing through a bedroom 

can some times transmit noise.

(d)  Low level BF terminals produce some 

4. INSTALL ATION

Regulations

Installation of the boiler must comply with the
following British Standards and Regulations:

BS 5410: Part 1 - Code of Practice for Oil Firing.

BS 5449 - Forced Circulation Hot Water
Central Heating Systems.

BS 7074 - Part 1 - Code of Practice for
Sealed Water System.

BS4543: Part 3 - Factory made insulated
chimneys.

The Building Regulations:
Part ‘L’ 
Current I.E.E. Regulations
Local water undertaking By-Laws
OFTEC Installation Requirements for Oil
Fired Boilers and Oil Storage Tanks. 

Health and Safety at Work Act

The installer should be aware of his respon-
sibilities under the Act and provide, where
necessary, appropriate protection for persons
carrying out the installation.

Содержание Contractor WM 70

Страница 1: ...d Copyright in this brochure and the drawings or illustrations contained in it is vested in Trianco Limited and neither the brochure or any part thereof may be reproduced without prior written consent...

Страница 2: ...ANCO To be retained by householder USER INSTALLATION COMMISSIONING SERVICING INSTRUCTIONS Contractor WM 70 OIL FIRED CENTRAL HEATING BOILERS FOR BALANCED OR CONVENTIONAL FLUE BED 92 42 EEC EMC 89 336...

Страница 3: ...isposable gloves face masks and eye protection After handling wash hands and other exposed parts When disposing reduce dust with water spray ensure parts are securely wrapped GLUES SEALANTS PAINT Glue...

Страница 4: ...to boiler 5 OIL SUPPLY 9 Oil storage tank Steel and Plastic 9 Oil supply line 9 Single pipe oil supply 10 Two pipe oil supply 11 Oil De aerator Single pipe supply 12 6 ELECTRICAL 13 7 COMMISSIONING 1...

Страница 5: ...nsure the system is full of water there is sufficient oil in the storage tank and all valves are open CheckthattheTimeswitch Programmer if fitted is ON and the room thermostat is calling for heat Set...

Страница 6: ...er it is essential that the oil burner is initially commissioned by an OFTEC trained and registered engineer and an annual service is given thereafter Notes ELECTRICAL SAFETY CHECKS SHOULD BE CARRIED...

Страница 7: ...UPPORT Tel 0114 257 2300 Fax 0114 257 2338 Hours of business Monday to Thursday 8 30am 4 45pm Friday 8 30am 2 30pm 3 1 2 3 TRIANCO CUSTOMER AFTER SALES SERVICE INFORMATION NOTE Burner nozzle is guaran...

Страница 8: ...d with the boiler The matched pressure jet burner which is exceptionally quiet in operation ensures clean and efficient combustion with low NOx emissions As the Trianco balanced flue boiler is a truly...

Страница 9: ...om pallet In the interest of safety the boiler should be commissioned by an OFTEC trained and registered engineer A useful guide to Safe Working Practices for Oil Firing Technicians is published by OF...

Страница 10: ...ld be positioned so as to avoid products of combustion entering the building Note 2 If the terminal is less than 2 metres above the ground level balcony or place to which any person has access the ter...

Страница 11: ...pth of wall remove and cut to size b Slide plastic tube back through wall position air vent on outside wall mark mounting holes and drill Insert plastic wall plugs and screw air vent in position make...

Страница 12: ...kness Flue Terminal Gasket Flue Box Cover and Gasket Flue Box Flue Box Gasket Boiler Body Flexible Hose Burner Jubilee Clips Connection Plate Wall Plate Flue Terminal Air Vent Plastic Tube 18 450 mm 8...

Страница 13: ...fire valve must be fitted in the oil line outside the building with its sensing phial positioned within the boiler casing below the control panel A clip is provided for retaining the phial All oil li...

Страница 14: ...UPPLY INSTALLATION H METRES 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 PIPE 6mm ID 10 21 31 41 52 62 73 83 PIPE 8mmID 33 66 98 100 100 100 100 100 MAXIMUM OIL SUPPLY LINE LENGTH L MAXIMUM LENGTH METRES TRIANCO C...

Страница 15: ...METRES 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 PIPE 6mm ID 48 42 36 30 24 18 11 5 PIPE 8mmID 100 100 100 94 75 55 36 16 PIPE 10MM ID 100 100 100 100 100 100 88 40 MAXIMUM OIL SUPPLY LINE LENGTH L MAXIMUM LENG...

Страница 16: ...12 DE AERATOR OIL SUPPLY INSTALLATION TRIANCO CONTRACTOR WM BOILER...

Страница 17: ...RICAL Control Box Installation Electricity Supply 230V Single Phase 50Hz All wiring to supply and all system com ponents external to the boiler must comply with the latest edition BS 7671 IEE Wiring R...

Страница 18: ...completing the boiler installation the installer should make a thorough check of the system to ensure it is com pletely satisfactory and demonstrate to the user the operation of the boiler and any sy...

Страница 19: ...ng great care not to damage the electrodes see Diag 6 Fit a new nozzle of the same specification taking the same care 7 Check the position of the electrodes after replacing the nozzle to ensure they h...

Страница 20: ...BFP 11R3 pump to a one pipe system fit the small horse shoe washer behind the third fixing screw and fit the return port plug This allows oil to circulate around the pump on one pipe installations TW...

Страница 21: ...SS 221312 13 COVER 221310 14 FAN HOUSING 221313 15 AIR DAMPER 221314 16 AIR CONVEYOR 221315 17 GASKET 221316 18 COVER AIR INLET 221317 19 CONTROL BOX BASE SATRONIC TF 830 3 207628 20 CONTROL BOX SATRO...

Страница 22: ...13 14 16 MINOR 1 EUROSTAR 50 65 MINOR 1 EUROSTAR 50 70 Wall 12 21 11 8 10 9 20 19 7 37 15 18 22 1 2 38 3 5 6 4 33 27 31 35 30 34 29 28 17 18 MINOR 1 Contractor WM70 Two Pipe System...

Страница 23: ...fully plugged in Air trapped in pump Bleed off air through pressure gauge tapping Solenoid valve faulty Check coil for continuity and replace if faulty Nozzle blocked Replace nozzle with one of same...

Страница 24: ...e system Low voltage Check with local Electricity Board Combustion readings incorrect Check combustion under normal running conditions and compare readings with those given on page 16 Oil level in tan...

Страница 25: ...lue Terminal Gasket 211053 1 6 Flexible Hose 211063 1 7 Jubilee Clip 95256 2 8 Hose Connection Plate 211050 1 9 Plastic Tube 211064 1 10 Gasket 211052 1 11 Air Vent 211065 1 12 M6 Nut 94217 8 13 Wood...

Страница 26: ...tom Baffle 208324 1 7 Compression Nut 99369 2 8 Olive 22mm 99370 2 9 Flexible Oil Line not shown 208351 2 10 Wall Mounting Bracket Assembly 208327 1 11 Casing Support Bracket 208336 1 12 Burner Suppor...

Страница 27: ......

Страница 28: ......

Отзывы: