
PRIMING AND ADJUSTING THE PUMP
Danfoss BFP 11 R3 Oil Pump Details
RETURN PIPE
CONNECTION 1/4'' BSP
SUCTION PIPE
CONNECTION 1/4''
BSP
SOLENOID VALVE
PRESSURE GAUGE/
BLEED PORT PLUG
PRESSURE
ADJUSTMENT
4mm ALLEN KEY
VACUUM
GAUGE
PORT
NOZZLE
PORT
FILTER
NOTE
To prime the pump first of all remove the pressure gauge bleed port plug until oil is seen to be present. Replace the pressure
gauge/bleed port plug. If the burner goes to lock out after the prepurging time due to lack of pressure in the oil pump
restart the burner
ONE PIPE SYSTEM
To convert the BFP 11R3 pump to a one pipe system fit the small horse shoe washer behind the third fixing screw and fit
the return port plug. This allows oil to circulate around the pump on one pipe installations.
TWO PIPE SYSTEMS
The BFP 11R3 pump on this burner is already set for 2 pipe systems.
NOTE WM 70 BURNER IS SUPPLIED FOR USE ON 2 PIPE SYSTEM
BOTTOM
FIXING SCREW
Small horse shoe washer
behind the third fixing screw
BLAST TUBE DISASSEMBLY
2-point screw fitting
on Minor 1 only
16
MODELS
BURNER
CONTRACTOR WM 70
MINOR 1
Voltage single phase 50Hz
V
240
Motor
W
70
Rpm
No
2800
Capacitor
uF
3
Ignition Transformer
kV/mA
8/20
Control box
SATRONIC
TF 830.3
Fuel: Kerosene
Mj/kg
43.3
Nozzle (USgal/h)
DANFOSS
0.6 (CEN) 80° EH
Pump Pressure
7.5 bar (110psi)
CO
2
(%)
11.0
Содержание Contractor WM 70
Страница 16: ...12 DE AERATOR OIL SUPPLY INSTALLATION TRIANCO CONTRACTOR WM BOILER...
Страница 27: ......
Страница 28: ......