24
Aztec Commissioning Report
Commission Details
Date of Completion: ________________________ Date of Commission: ______________________
Serial Number: _________________________________________________________
RCD
-
Existing/New: ________________________ Size: _________
Supply Cable
-
Existing/New: _________
Diameter (mm): __________
Isolation valves fitted to all boiler outlets Y/N______________
Magnetic Filter Fitted to Heating circuit Y/N______________
In-line scale inhibitor fitted Y/N______________
Incoming Cold-Water Pressure ______________Bar
What is the maximum Hot water flow rate set at? _________l/min
Has the strainer been cleaned of installation debris Y/N __________
What is the hot water temperature at the nearest outlet? __________°C
All appropriate pipes have been insulated __________
The tundish and discharge pipework have been connected and terminated to Part G of the building regulations _________
Where is the pressure reducing valve situated ________________________________
The hot water system complies with the appropriate Building Regulations _________
By signing you agree that you have installed the boiler in accordance with these instructions and that the boiler is working as
intended.
Plumber
Signed: ________________________ Date: __________________________
Electrician
Signed: ________________________ Date: ___________________________
Customer Acceptance
I confirm that I have received training and instruction on how to operate and maintain this appliance.
I understand the warranty on this product, and I have been provided with a User Manual and Operating Instructions.
Customer Signature: ____________________________________
Date: _____________________
Installation Details
Name:
Address: ______________________________________
______________________________________________
______________________________________________
Tel:
_______________________________
Mobile No:
_______________________________
Email:
_______________________________
Commissioning Engineer Details
Name:
Address: ______________________________________
______________________________________________
BPEC G3 CERT No _______________________________
Tel:
_______________________________
Mobile No:
________________________________
Email:
_______________________________
Содержание Aztec Classic WM Maxi Combi
Страница 17: ...17 Water Connections Pipe Work Layout ...
Страница 23: ...23 ...