EXPLODED VIEW
Страница 1: ...SF11 DECK SCALER OPERATION MAINTENANCE ...
Страница 2: ...ators Pre Start Check Air Supply The compressed air must be free from water or contamination Always clear the air hose before connection to the tool Ensure that no moisture condensation is present Ensure that a minimum 19mm 3 4 bore airline is used and that all couplings are tight and secure If possible try to limit the length of airline to 33 ft 10 metres Air consumption is shown under Technical ...
Страница 3: ...Align mounting holes on sub frame 22 with anti vibration pad 21 studs and fit as shown in service layout Fit washer 20 and locknut 19 to both studs and fasten both nuts down to a torque of 40lb ft Wheel to Sub frame Slide wheel 23 onto sub frame axle fit washer 20 and insert a new split pin 24 into the hole Separate legs on split pin and bend round with pliers or otherwise Repeat on the other whee...
Страница 4: ...EXPLODED VIEW ...
Страница 5: ...y 731 0120 Polyurethane seal Parts list Risk of Hand Arm Injury Because of various factors the range of vibration emission during intended use of this tool is expected to be between 5 8m s2 8 1m s2 for this Scaler The vibration is dependent on the task the operators grip and the feed force employed etc Noise level measured in accordance with EN ISO 15744 1999 Vibration measured in accordance with ...