HARDWARE NEEDED
A-3- 3/8” x 3 1/2” Hex Lag Screw-
(8)
A-6- 3/8” USS Flatwasher-
(8)
A-1- 1/4” x 3” Hex Lag Screw-
(12)
A-5- 1/4” USS Flatwasher-
(24)
A-2- 1/4” x 4 1/2” Hex Lag Screw-
(12)
PARTS NEEDED
046-2- 4- Hole Facia-
(2)
Rail Assembly-
(6)
Extended Loft Assembly
04
6-2
A-
2
A-5
A-1
A-5
A-6
A-3
Ra
il A
sse
mb
ly
Содержание 7.0 Bengal Fort Double Decker
Страница 1: ......
Страница 103: ...KSI 047 Extended Loft Wood Roof Lumber Description QTY 047 8 92 Wood Roof Board 18 ...
Страница 106: ...KSI 046 Extended Loft Accessories Description QTY 046 A Bubble Panel 1 046 B Binocul ar 1 ...
Страница 120: ...Extended Loft ...