
15.
Clean the roller clutch with denatured
alcohol or electric motor spray, and lube
the roller clutch with after-run oil. Slide
the roller clutch onto the starter shaft as
shown (1501).
Note:
The roller clutch is to be installed
onto the starter shaft so that the clutch
engages the starter shaft clockwise and
rotates freely counter-clockwise. The
engraved text on the roller clutch faces
the engine backplate for correct rotation.
Slide the EZ-Start system or pull start onto
the starter shaft that exits the backplate of
the engine. Line up the drive with the
roller clutch. Fasten the EZ-Start gear case
to the backplate with the three 3x12BCS
screws (1502). Fasten the pull starter with
(4) 3x12BCS.
16.
Inspect the exhaust O-ring and
replace it if it is damaged or torn. Fasten
the exhaust header and pipe assembly
back onto the rear of the engine case with
the two 3x15CS screws (1601).
The engine, clutch, exhaust system
and starter assembly is now ready
for installation into the chassis (1602).
Follow the instructions for the proper
break-in procedure of a new TRX 2.5R
Racing Engine.
1501
1502
1602
1601
TRX 2.5R • 38
REBUILDING THE TRX 2.5R
Содержание TRX 2.5R
Страница 1: ...OWNERS MANUAL ...
Страница 40: ...1 1 00 Klein Road Plano Texas 75074 1 888 TRAXXAS 051007 ...