
S
TOVE
I
NSTALLATION
(C
ONT
.)
- For Qualified Installers Only!
P
AGE
11
Approved Venting Configurations with a Horizontal Termination
¥ Minimum 3' (.9 M) vertical section directly off the stove for propane, 2' (.5 M) for natural gas.
¥
If using a
Snorkel Termination
(14" or 36") add the snorkel height to the vertical height (snorkel
terminations are used primarily for basement installations).
¥
The termination must fall within the shaded area shown in the chart. Use the indicated restrictor position.
AAAAAAA
AAAAAAA
AAAAAAA
AAAAAAA
AAAAAAA
5 feet
(1.5 M)
0 feet
10' (max)
(3 M)
0 feet
5 feet
(1.5 M)
0 feet
0 feet
NOTE:
Horizontal sections
require a 1/4" (6 mm)
rise every 12" (300 mm)
of travel.
8'(max)
(2.4 M)
NOTE:
A minimum 2' (.6 M)
rise is required directly
off of the stove.
Restrictor
Position # 1
8' (max)
(2.4 M)
Natural Gas
Installations
AAAAAAA
AAAAAAA
AAAAAAA
AAAAAAA
0 feet
0 feet
0 feet
0 feet
NOTE:
A minimum 3' (.9 M)
rise is required directly
off of the stove.
Restrictor
Position # 1
Propane (LP)
Installations
5 feet
(1.5 M)
10' (max)
(3 M)
5 feet
(1.5 M)
NOTE:
Horizontal sections
require a 1/4" (6 mm)
rise every 12" (300 mm)
of travel.
5 feet
(1.5 M)
10' (max)
(3 M)
5 feet
(1.5 M)
8'(max)
(2.4 M)
8' (max)
(2.4 M)
5 feet
(1.5 M)
10' (max)
(3 M)
5 feet
(1.5 M)