Travis Industries, Inc.
Model: Endeavor
Report Number:0028WS062E
OMNI-Test Laboratories, Inc.
Table 10 – Test Configurations
Run
Startup Procedures
Combustion Air
1
Fuel Loading: Kindling and start-up fuel loaded together, a torch was used
for 15 seconds to establish a fire. At 58 minutes placed fuel load into the
firebox and closed the loading door. Loading required less than 1 minute to
complete.
Door: For kindling and start-up fuel, loading door was closed by 15 seconds.
Test fuel load; fuel loading door was closed 30 seconds after loading.
Primary Air: Air control fully open for the entire test.
Secondary: No user control for secondary air.
Fan: Fan turned onto high 49 minutes after starting kindling fire, remained
on high for the entire test.
Bypass: Not used for ignition of kindling or loading test fuel load.
Fully open for
entire test.
2
Fuel Loading: Test fuel loaded onto coal bed generated by test number 1 by
45 seconds.
Door: Closed by 50 seconds.
Primary Air: Fully open, then set to 19/64” by 9.5 minutes.
Secondary: No user control for secondary air.
Fan: Fan on high entire test.
Bypass: Not used for loading test fuel load.
Fully open for first
9.5 minutes, then
set to 19/64”.
3
Fuel Loading: Kindling and start-up fuel loaded together, a torch was used
for 15 seconds to establish a fire. At 54 minutes placed fuel load into the
firebox and closed the loading door. Loading required less than 1 minute to
complete.
Door: For kindling and start-up fuel, loading door was closed by 15 seconds.
Test fuel load; fuel loading door was closed 30 seconds after loading.
Primary Air: Air control fully open for the entire test.
Secondary: No user control for secondary air.
Fan: Fan turned onto high 45 minutes after starting kindling fire, remained
on high for the entire test.
Bypass: Not used for ignition of kindling or loading test fuel load.
Fully open for
entire test.
4
Fuel Loading: Test fuel loaded onto coal bed generated by test number 3 in
55 seconds.
Door: Closed by 60 seconds.
Primary Air: Fully open, then set to fully closed by 13 minutes.
Secondary: No user control for secondary air.
Fan: Fan on high entire test.
Bypass: Not used for loading test fuel load.
Fully Closed
5
Fuel Loading: Kindling and start-up fuel loaded together, a torch was used
for 20 seconds to establish a fire. Fuel loading required 25 seconds to
complete.
Door: For kindling and start-up fuel, loading door was closed by 25 seconds.
Test fuel load; fuel loading door was closed 30 seconds after loading.
Primary Air: Air control fully open for the entire test.
Secondary: No user control for secondary air.
Fan: Fan turned onto high 45 minutes after starting kindling fire, remained
on high for the entire test.
Bypass: Not used for ignition of kindling or loading test fuel load.
Fully open for
entire test.
Page 10 of 186
Содержание Endeavor
Страница 22: ...Page 22 of 186 ...
Страница 23: ...Page 23 of 186 ...
Страница 24: ...Page 24 of 186 ...
Страница 34: ...Page 34 of 186 ...
Страница 35: ...Page 35 of 186 ...
Страница 56: ...Page 56 of 186 ...
Страница 57: ...Page 57 of 186 ...
Страница 67: ...Page 67 of 186 ...
Страница 68: ...Page 68 of 186 ...
Страница 91: ...Page 91 of 186 ...
Страница 103: ...Page 103 of 186 ...
Страница 104: ...Page 104 of 186 ...
Страница 108: ...Page 108 of 186 ...
Страница 109: ...Page 109 of 186 ...
Страница 110: ...Page 110 of 186 ...
Страница 111: ...Page 111 of 186 ...
Страница 112: ...Page 112 of 186 ...
Страница 113: ...Page 113 of 186 ...
Страница 114: ...Page 114 of 186 ...
Страница 116: ...Page 116 of 186 ...
Страница 117: ...Page 117 of 186 ...
Страница 118: ...Page 118 of 186 ...
Страница 120: ...Page 120 of 186 ...
Страница 121: ...Page 121 of 186 ...
Страница 122: ...Page 122 of 186 ...
Страница 123: ...Page 123 of 186 ...
Страница 124: ...Page 124 of 186 ...
Страница 127: ...7 20 18 Page 127 of 186 ...
Страница 130: ...7 20 18 Page 130 of 186 ...
Страница 131: ...Page 131 of 186 ...
Страница 133: ...Page 133 of 186 ...
Страница 136: ...Page 136 of 186 ...
Страница 184: ...34 Optional Equipment Travis Industries 2 25 2019 1507 Endeavor II Listing Label ...