12
Stove Installation
(for qualified installers only)
© Travis Industries
2/1/2019 - 1507
Endeavor II
Chimney Termination Requirements
Must have an approved cap (to prevent water from entering)
Must not be located where it will become plugged by snow or other material
Must terminate at least 3' above the roof
and
at least 2' above any portion of the roof within 10' (see
Figure 5).
Figure 5
Outside Air Requirements
Required for mobile homes & in certain localities (check with building officials).
Must not be drawn from an enclosed space (garage, unventilated crawl space). May be drawn from
ventilated crawl space (a) or exterior of home (d). Must have suitable rodent/debris screen and rain
protection (hood).
Requires the optional outside air kit (sku# 99200139) – see below.
Air duct maximum length is 15’ (4.57M) with a minimum cross section of 16 square inches
(10323mm) or 6’ (1.83M) with a minimum cross section of 7 square inches (4517mm).
Figure 6
Min. 3’ (914mm)
Min. 2’ (610mm)
10’ (3.04M)
Min. 3’ (914mm)
10’ (3.04M)
Min. 2’ (610mm)
Outside Air
Connector
Outside air entrance must be placed so
it does not become blocked by snow.
Air may be drawn from a ventilated
crawl space or use an air duct.
IDB01279
Содержание Endeavor
Страница 22: ...Page 22 of 186 ...
Страница 23: ...Page 23 of 186 ...
Страница 24: ...Page 24 of 186 ...
Страница 34: ...Page 34 of 186 ...
Страница 35: ...Page 35 of 186 ...
Страница 56: ...Page 56 of 186 ...
Страница 57: ...Page 57 of 186 ...
Страница 67: ...Page 67 of 186 ...
Страница 68: ...Page 68 of 186 ...
Страница 91: ...Page 91 of 186 ...
Страница 103: ...Page 103 of 186 ...
Страница 104: ...Page 104 of 186 ...
Страница 108: ...Page 108 of 186 ...
Страница 109: ...Page 109 of 186 ...
Страница 110: ...Page 110 of 186 ...
Страница 111: ...Page 111 of 186 ...
Страница 112: ...Page 112 of 186 ...
Страница 113: ...Page 113 of 186 ...
Страница 114: ...Page 114 of 186 ...
Страница 116: ...Page 116 of 186 ...
Страница 117: ...Page 117 of 186 ...
Страница 118: ...Page 118 of 186 ...
Страница 120: ...Page 120 of 186 ...
Страница 121: ...Page 121 of 186 ...
Страница 122: ...Page 122 of 186 ...
Страница 123: ...Page 123 of 186 ...
Страница 124: ...Page 124 of 186 ...
Страница 127: ...7 20 18 Page 127 of 186 ...
Страница 130: ...7 20 18 Page 130 of 186 ...
Страница 131: ...Page 131 of 186 ...
Страница 133: ...Page 133 of 186 ...
Страница 136: ...Page 136 of 186 ...
Страница 184: ...34 Optional Equipment Travis Industries 2 25 2019 1507 Endeavor II Listing Label ...