![Travis Industries DVL EF Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/travis-industries/dvl-ef/dvl-ef_owners-manual_1154083019.webp)
Installation
(for qualified installers only)
1 9
Travis Industries
4041206
1 0 0 - 0 1 1 4 7
Vent Installation
•
In addition to the requirements below, follow the requirements provided with the vent.
Vertical Termination
(part # 1291)
Use a roof flashing and storm collar
whenever passing through the roof
Vertical Vent
Requirements
Horizontal Vent
Requirements
Min. 1" Clearance on
Vertical Sections to
combustible surfaces.
Use a firestop whenever passing through a
ceiling (or enclosure and at every floor
penetration.
Combustible
Framing
Use the Travis Firestop (part # 93006094) when passing through a
wall. NOTE: make sure the firestop is postitioned correctly so the 3"
clearance is allowed above the vent.
3" Min.
1" Min.
1" Min.
Combustible
Surfaces
•
Slide the vent sections together and turn 1/4 turn until the sections lock in
place.
•
Screws are not required to secure the vent. However, three screws may be
used to secure vent sections together if desired.
•
High temperature sealant is recommended at the appliance starter section
connection (use high-temperature silicone or Mill-Pac®).
•
If disassembly is required, at time of re-assembly check to see if the vent
creates a tight fit. If it does not, apply high temperature sealant to the joints of
the affected sections.
•
Horizontal sections require a 1/4" rise every 12" of travel
•
Horizontal sections require non-combustible support every three feet (e.g.: plumbing tape)