background image

ZC Kit – Large Pellet Insert

(99200149)

Page 3 of 8

10/9/06

© Travis Industries, Inc.

Vent Termination Requirements (See the illustration below)

Must have an approved cap (to prevent water from entering) or a 45° downturn.

If the termination is located on a windy side of the house, an approved house shield is

recommended to prevent soot from building up on the side of the house.

Must not be located where it will become plugged by snow or other material.

Horizontal terminations must protrude 12" from the wall, vertical terminations require 24".

H

G

A

D

F

NOTE: Measure clearances to the nearest edge of the exhaust hood. 

A

E

B

C

F

X

A

Minimum 4' clearance below or beside any door or window that opens

B

Minimum 1' clearance above any door or window that opens

C

Minimum 2' clearance from any adjacent building

D

Minimum 7' clearance above any grade when adjacent to public walkways

NOTE: Vent may not terminate in covered walkway or breezeway.

E

Minimum 2' clearance above any grass, plants, or other combustible materials

F

Minimum 3' clearance from any forced air intake of any other appliance

G

Minimum 2' clearance below eaves or overhangs

H

Minimum 1' clearance horizontally from combustible wall

X

Must be a minimum of 2' above the roof

Содержание 99200149

Страница 1: ...s is met refer the directions included with the thimble for additional details Remove the starter collar from the pellet heater and install it onto the elbow seal with silicone Determine the correct length for the horizontal section of vent the center of the starter collar is 11 25 behind the enclosure opening and attach it to the elbow seal with silicone Place this flue section aside until after ...

Страница 2: ...ough ceilings make sure to maintain 3 clearance to any combustibles No more than 180 of elbows two 90 elbows one 90 and two 45 elbows etc Pellet vent connections must be sealed airtight with 500 F RTV silicone and screwed together with at least three sheet metal screws Seal each vent section including adapters elbows etc by injecting a liberal amount of 500 F RTV silicone into the gap between sect...

Страница 3: ...terminations require 24 H G A D F NOTE Measure clearances to the nearest edge of the exhaust hood A E B C F X A Minimum 4 clearance below or beside any door or window that opens B Minimum 1 clearance above any door or window that opens C Minimum 2 clearance from any adjacent building D Minimum 7 clearance above any grade when adjacent to public walkways NOTE Vent may not terminate in covered walkw...

Страница 4: ...rround panels are 32 tall When determining depth include the facing material drywall tile etc see the illustration below When venting vertically there is no maximum depth Width Depth Height When determining the position of the insert consider the position of the framing behind the insert relative to the vent see the illustration below When determining the depth include the facing material drywall ...

Страница 5: ...ill need to raise the insert and enclosure height the equivalent amount The leveling bolts may be used on the insert for adjustments AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA AAAAAAAAAAAA 45 Min width of surround panels 18 Min Floor Protection AA AA AA AA AAAA...

Страница 6: ... top vent applications A A A A Use the included screws to secure the zc can sides and top to the zc can rear panel Rear Vent Shield not required for top vent applications A A A AAA AAA AAA AAA A A A A knock out is provided on the rear panel for rear vent applications Bend the mounting flange as shown AA AA AA AA A A AA AA A A AA AA A AAAAAAA AAAAAAA AAAAAAA Bend the top stand off as shown and secu...

Страница 7: ...AAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAAAA AAAA...

Страница 8: ...d the use of the Insert Wiring Kit when installing this kit SKU 97200315 This kit allows for the power cord to be hard wired behind the walls eliminating the need for a visible power cord A AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAAAAA AA AA AA Wall Thimble note 3 clearance between vent and combustibles 12 Minimum A A A A A A A A A A A A AAAAAAAAAAAAAAA A A A A A A A A A A A Enclosure He...

Отзывы: