Finalizing the Installation
(for qualified installers only)
43
© Travis Industries
4090501
100-01226_000
Steps for Finalizing the Installation
1. Remove the glass (see page 45).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3. Make sure the two accent light bulbs are in place.
NOTE
: .Take care to not touch the bulb with your fingers (use a cloth or paper towel).
4. Install the four AA batteries (included in the owner’s pack) into battery holder (see the illustration below). The AA
batteries act as a power backup in case the household (AC) power goes out. Install the 9v battery (included in
the owner’s pack) into control panel light assembly (see the illustration below). The battery holder is held in place
with Velcro and may be removed for easier access.
AA Battery
AA Battery
Lift up and swing the lower
grill down to acces the area
below the firebox.
Swing the concealment
cover up and slide it back to
expose the controls.
AA
Battery
Holder
AA Battery Tray
AA Battery
AA Battery
9v
Battery
Battery Holder for
Control Panel Lights
5. Install the logs (see page 47).
6. Replace the glass.
7. Start the heater.
8. Leak test all gas joints.