Thank you for your decision to purchase a Traulsen Blast Chiller. This important piece of food
safety equipment is built to our highest standards and will provide you with years of dependable
service. However, it is important to note that although this product is designed to chill product from
135
°
F down to below 41
°
F within FDA/HACCP guidelines, several operational factors, such as
product temperature, density, loading, etc. will all effect actual chilling performance. As a result,
although easy to use, the operation of blast chilling requires diligent attention on the part of the
operator(s) in order to insure proper results.
It is also important to note many perceived service problems can actually be attributed to
operational issues, resulting in lost product and/or service down time. Please review the
instructions contained in this manual completely, and make certain that all operators are well trained
in the equipments proper use.
TABLE OF CONTENTS
SECTION 2: CONTROL OPERATION DETAILS
VI. The SmartChill
®
Control
a-The SmartChill Control - Overview
Page 10
b-Printing Capability
Page 10
c-Control Basics
Page 10
d-Start-Up
Page 10
e-Over Temperature
Page 10
f-In The Event Of A Power Interruption
Page 10
g-Getting Started
Page 10
h-EZ Start
Page 10
VII. Operating The Blast Chill Control
a-Starting A Chill Cycle By Temp
Page 11-12
b-Starting A Chill Cycle By Time
Page 13
c-Starting A Chill Cycle By Product
Page 14
d-Chill By Product Feature - Product List
Page 15
e-Refrigerated Hold Mode
Page 16
f-Staring A Manual Defrost
Page 16
g-Printing Batch/Chill Cycle Data
Page 17
h-Set-Up Products
Page 18
i-Set-Up Users
Page 19
j-Accessing The SYSPAR
Page 20
k-SYS PAR
Page 21
SECTION 3: OTHER/MISC.
VIII. SmartChill
®
Communications
a-Introduction
Page 22
b-System Requirements
Page 22
c-Operation
Page 22
d-Communicating With SmartChill
Page 22
e-Hardware Connection
Page 22
IX. Glossary
Page 23
X. Replacement Parts List
Page 24
XI. Summary of Error Messages
Page 25
XII. Warranty Information
Page 26
XIII. Mechanical Trouble Shooting Guide
Back Cover
GETTING STARTED: QUICK START CHECK-LISTS & GUIDELINES
Blast Chiller Installation Checklist
Page 2
Blast Chiller Quick Start Checklist
Page 3
Basic Operating Guidelines
Page 4
SECTION 1: RECEIPT, INSTALLATION, CARE & MAINTENANCE
I. Introduction
Page 1
II. Receipt Inspection
Page 5
III. Installation
a-Location
Page 5
b-Packaging
Page 5
c-Wiring Diagram
Page 5
d-Installing Legs or Casters
Page 5
e-Assembly Of Models RBC400 & RBC400RT
Page 5
f-Cord & Plug
Page 6
g-Electrical Requirements
Page 6
h-Proper Clearances
Page 6
i-Condensate Removal
Page 7
j-Remote Unit BTU Requirements
Page 7
k-Remote Unit Cut-Out Settings
Page 7
l-Sealing Roll-In/Roll-Thru Units
Page 7
m-ON/OFF Power Switch
Page 7.
n-Installing RBC50 Control Panel
Page 8
IV. Care & Maintenance
a-Cleaning The Condenser
Page 8
b-Printer Supplies
Page 8
c-Installing Printer Paper
Page 8/9
d-Cleaning The Exterior
Page 9
e-Cleaning The Interior
Page 9
f-The Serial Tag
Page 9
V. Other
a-Service Agency Check & Start-Up
Page 9
b-On-Site Blast Chill Training
Page 9
c-Service Information
Page 9
d-Demonstrations
Page 9
e-Blast Chill Video
Page 9
f-Blast Chill Data Communications Kit
Page 9
-1-
I. INTRODUCTION