48
Transport, Installation, Commissioning
TNL12.2
DTE070EN - 15.09.2021
Installing the configuration levels and additional equipment
Connecting the cooling lubricant unit
If the spindle cooling (water-water cooling) is realized through a cen-
tral cooling system, the hose connection should be provided with a
stopcock or a quick-connect coupling to allow cleaning of the chip
conveyor
• Remove the blanking plugs from the connection kits and connect the
connection kits to the machine and cooling lubricant unit according to the
marking
• Electrical connection of the cooling lubricant system
Содержание TNL12.2
Страница 6: ...6 Transport and installation TNL12 2 DTE070EN 15 09 2021 Table of Contents ...
Страница 8: ...8 Transport TNL12 2 DTE070EN 15 09 2021 Safety ...
Страница 16: ...16 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 General ...
Страница 32: ...32 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Transporting the machine ...
Страница 44: ...44 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Installing the machine ...
Страница 50: ...50 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Electrical connection ...
Страница 52: ...52 Transport Installation Commissioning TNL12 2 DTE070EN 15 09 2021 Pneumatic connection ...
Страница 56: ...56 Transport installation commissioning TNL12 2 DTE070EN 15 09 2021 Commissioning ...
Страница 61: ......