background image

©2017 Thermaco, Inc. All rights reserved  •  Patented/Patents Pending  •  Specifications subject to change without notice

Thermaco, Inc. • 646 Greensboro St. • Asheboro, N. C. 27204-2548 • (336) 629-4651

MNL-TZ  12

A THERMACO® Technology

Trapzilla

®

 Grease Interceptor

Installation and Operations Manual

TZ-160, TZ-400, TZ-600 Models

AFE

MNL-TZ  11

Note: Drawing for reference only.  Equipment must be installed in compli-

ance with all applicable laws, regulations and codes, including plumbing 

codes.  Installation should be performed by a qualified plumber. 

*Use a Two-Way Cleanout before 

and after all Trapzilla Installations

1

1

2

2

3

3

4

4

A

A

B

B

C

C

D

D



THIS DRAWING CONTAINS PROPRIETARY AND PATENTED MATERIAL.  THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE OR PART WITHOUT

WRITTEN CONSENT FROM THERMACO, INC.  POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE.

POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREEMENT BETWEEN THERMACO, INC. AND THE HOLDER OF

THIS DRAWING.  DO NOT DESTROY THIS DRAWING, IT IS THE SOLE PROPERTY OF THERMACO, INC. AND MUST BE RETURNED UPON REQUEST.

MATERIAL (UNLESS NOTED)

FINISH (UNLESS NOTED)

646 GREENSBORO STREET

PO BOX 2548, ASHEBORO, NC 27203

VOICE 336-629-4651 FAX 336-626-5739

Decimals

.XX +/- .03

.XXX +/- .015

Unless otherwise specified

Dimensions are in inches

Tolerances

Angular

+/- 1°

CHECKED

SIZE

REV. NO.

DWG NO.

PART NO.

C

SCALE

RELEASE DATE

SHEET     OF

ENGINEERING

DRAWN

DATE

THIRD ANGLE PROJECTION

Outlet

Inlet

*Cleanout

*Cleanout

Outlet Vent

(Connect to 

facility vent)

3.3.2 Installing Two Trapzilla Units in Parallel

Two Trapzilla Grease Interceptors should be installed in parallel with a Flow Splitter diverting the flow.  

Place Two-Way Cleanouts before, between and after the units as shown below, including before and 

after the flow splitter.  Make sure to connect an outlet vent after each Trapzilla Grease Interceptor.  A 

Low Head Flow Control (LHFC) is shipped with each unit, and if needed should only be installed after 

the first Cleanout and before the Flow Splitter.

Note: Drawing for reference only.  Equipment must be installed in compli-

ance with all applicable laws, regulations and codes, including plumbing 

codes.  Installation should be performed by a qualified plumber. 

1

1

2

2

3

3

4

4

A

A

B

B

C

C

D

D



THIS DRAWING CONTAINS PROPRIETARY AND PATENTED MATERIAL.  THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE OR PART WITHOUT

WRITTEN CONSENT FROM THERMACO, INC.  POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE.

POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREEMENT BETWEEN THERMACO, INC. AND THE HOLDER OF

THIS DRAWING.  DO NOT DESTROY THIS DRAWING, IT IS THE SOLE PROPERTY OF THERMACO, INC. AND MUST BE RETURNED UPON REQUEST.

MATERIAL (UNLESS NOTED)

FINISH (UNLESS NOTED)

646 GREENSBORO STREET

PO BOX 2548, ASHEBORO, NC 27203

VOICE 336-629-4651 FAX 336-626-5739

Decimals

.XX +/- .03

.XXX +/- .015

Unless otherwise specified

Dimensions are in inches

Tolerances

Angular

+/- 1°

CHECKED

SIZE

REV. NO.

DWG NO.

PART NO.

C

SCALE

RELEASE DATE

SHEET     OF

ENGINEERING

DRAWN

DATE

THIRD ANGLE PROJECTION

Cleanout*

Cleanout*

Cleanout*

Cleanout*

Outlet

Outlet

Inlet

Trapzilla

TZ-600 unit

Trapzilla

TZ-600 unit

*Use a 4" (100 mm) Two-Way Cleanout for TSS-70,

TSS-95, TZ-400 and TZ-600 Unit Installations

Outlet Vent

(Connect to

facility vent)

4" (100 mm) Flow Splitter

*Use a Two-Way Cleanout before and after all 

Trapzilla Installations

Flow Splitter

3.3 Plumbing Configurations

3.3.1 Installing One Trapzilla Unit

Each Trapzilla unit is shipped with a Low Head Flow Control module (see LHFC box for additional 

instructions).  This needs to be installed to the inlet of the Trapzilla and connected to a code-approved 

air intake.  Thermaco, Inc. recommends installation of Two-Way Cleanouts on both the Inlet and Outlet 

of Trapzilla

®

 in accordance with all applicable laws, regulations and codes.  

These cleanouts should 

match the size of the Inlet and Outlet Piping (i.e. for 4” plumbing, a 4” cleanout should be used).  

A Vent on the Outlet piping is also to be installed in accordance with all applicable laws, regulations and 

codes.

Содержание TZ-160 series

Страница 1: ...e 800 633 4204 Phone 336 629 4651 Fax 336 626 5739 info thermaco com www trapzilla com Installation Maintenance Instructions For Trapzilla Grease Interceptors Part MNL TZ AFE Please consult Thermaco Inc for specific models tested certified and or listed by these organizations Conforms to ASME Standard ASME A112 14 3 2000 Please consult Thermaco Inc for specific models tested certified and or liste...

Страница 2: ...y units grease removal devices and other similar plumbing devices receiving kitchen flows from sinks floor drains woks and other food bearing sources may generate odors There are many factors influencing odor evolution and dissemination These include room ventilation kitchen menu ambient temperatures ware washing practices grease oil input daily input fluid volume sanitizers installation plumbing ...

Страница 3: ...CALE RELEASE DATE SHEET OF ENGINEERING DRAWN DATE THIRD ANGLE PROJECTION Model available with 6 Inlet Outlet add suffix 6 to model TZ 600 SSA 1 1 2 2 3 3 4 4 A A B B C C D D THIS DRAWING CONTAINS PROPRIETARY AND PATENTED MATERIAL THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE OR PART WITHOUT WRITTEN CONSENT FROM THERMACO INC POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE POSS...

Страница 4: ...INC POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREEMENT BETWEEN THERMACO INC AND THE HOLDER OF THIS DRAWING DO NOT DESTROY THIS DRAWING IT IS THE SOLE PROPERTY OF THERMACO INC AND MUST BE RETURNED UPON REQUEST MATERIAL UNLESS NOTED FINISH UNLESS NOTED 646 GREENSBORO STREET PO BOX 2548 ASHEBORO NC 2720...

Страница 5: ...nection must be present as close as possible to the Trapzilla outlet to prevent possible siphonage prob lems The Vent on the Outlet piping is to be installed in accordance with all applicable laws regulations and codes Failure to provide a vent for the system voids Thermaco s Limited Warranty for the system 3 1 5 For High Head Height Applications Over Six 6 Feet 1 95 m For installations where ther...

Страница 6: ...d should only be installed after the first Cleanout and before the Flow Splitter Note Drawing for reference only Equipment must be installed in compli ance with all applicable laws regulations and codes including plumbing codes Installation should be performed by a qualified plumber 1 1 2 2 3 3 4 4 A A B B C C D D THIS DRAWING CONTAINS PROPRIETARY AND PATENTED MATERIAL THIS DRAWING MAY NOT BE REPR...

Страница 7: ...4 100 mm Two Way Cleanout for TSS 70 TSS 95 TZ 400 and TZ 600 Unit Installations Outlet Inlet Cleanout Cleanout Cleanout Trapzilla TZ 600 unit Trapzilla TSS 95 unit 3 3 4 One Solids Separator and Two Trapzilla Units A single Trapzilla Solids Separator and two Trapzilla Grease Interceptors should be installed by placing the Solids Separator in line and then using a Flow Splitter to divert the water...

Страница 8: ...DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREEMENT BETWEEN THERMACO INC AND THE HOLDER OF THIS DRAWING DO NOT DESTROY THIS DRAWING IT IS THE SOLE PROPERTY OF THERMACO INC AND MUST BE RETURNED UPON REQUEST MATERIAL UNLESS NOTED FINISH UNLESS NOTED 646 GREENSBORO STREET PO BOX 2548 ASHEBORO NC 27203 VOICE 336 629 4651 FA...

Страница 9: ...n series the change in elevation from the inlet to the outlet of a unit requires that each preceding unit be installed 1 higher than the unit after it For above ground units pressure treated plywood may be placed fully beneath the support stand to create the height difference All installations inside of a building must have a vessel vent installed and piped to atmosphere TZ 600 SSA or TSS 95 SSA T...

Страница 10: ... grade Follow the steps below to set the exten sion collar prior to backfilling the hole with concrete Amount of extension collar needed to bring Solid Top Cover to grade Step 2 Remove the extension collar adapter ring from the unit with the extension collar still in place On the underside of the cover mark the excess extension col lar length at the bottom of the four 4 skirt portions of the adapt...

Страница 11: ...er cutting along line Reinsert extension collar into adapter ring to insure alignment Adapter ring Extension collar Modified extension collar Self tapping screws 8 Places Adapter ring Skirt 5 16 inch Hex Nut 4 Places 5 16 inch Washer 4 Places Note Tighten down the flat washers and brass nuts using a 5 16 inch socket and rachet Do not over tighten 5 4 Concrete Calculations for TZ Models Components ...

Страница 12: ...uded with HA 400 600 SSA 160 Support Stand Included with HA 160 7 0 Measuring Grease Solids Levels Due to its unique design Trapzilla is capable of retaining high quantities of grease in a compact footprint Therefore unlike traditional interceptors Trapzilla can hold an extraordinarily high percentage of its volume in grease without losing separation efficiency To determine the current levels of g...

Страница 13: ... any defect or damage resulting directly or indirectly from i failure to properly install operate or maintain the Product in accordance with Thermaco s instructions including without limitation use in excess of rated flow installation deeper than manufacturer s recommendation or in conjunction with unapproved components use to remove emulsified fats and oils or use that fails to comply with applic...

Отзывы: