background image

 

 

NM2-GXE-2230-xx-01 Install Guide 

33724 Rev. C 

           

https://www.transition.com

  

Page 

14

 of 

15

 

Declaration of Conformity 

 

Modification

 

of

 

NIC

 

voids

 

regulatory

 

agency

 

compliance.

 

See

 

packaging

 

for

 

DoC,

 

FCC,

 

Canadian

 

and

 

European

 

regulations

 

and

 

warnings,

 

and

 

other

 

regulatory

 

agency

 

information.

  

High

 

Risk

 

Activities

 

Disclaime

r:

 

Components,

 

units,

 

or

 

third

party

 

products

 

used

 

in

 

the

 

product

 

described

 

herein

 

are

 

NOT

 

fault

tolerant

 

and

 

are

 

NOT

 

designed,

 

manufactured,

 

or

 

intended

 

for

 

use

 

as

 

on

line

 

control

 

equipment

 

in

 

the

 

following

 

hazardous

 

environments

 

requiring

 

fail

safe

 

controls:

 

the

 

operation

 

of

 

Nuclear

 

Facilities,

 

Aircraft

 

Navigation

 

or

 

Aircraft

 

Communication

 

Systems,

 

Air

 

Traffic

 

Control,

 

Life

 

Support,

 

or

 

Weapons

 

Systems

 

("High

 

Risk

 

Activities").

 

Transition

 

Networks

 

and

 

its

 

supplier(s)

 

specifically

 

disclaim

 

any

 

expressed

 

or

 

implied

 

warranty

 

of

 

fitness

 

for

 

such

 

High

 

Risk

 

Activities.

 

Record of Revisions 

Rev

 

Date

 

Notes

 

A

 

6/5/17

 

Initial

 

release

 

for

 

production.

 

B

 

12/11/17

 

Update

 

driver

 

information.

 

C

 

3/18/19

 

Update

 

install

 

procedure.

 

Trademark

 

notice:

 

All

 

trademarks

 

and

 

registered

 

trademarks

 

are

 

the

 

property

 

of

 

their

 

respective

 

owners.

  

Copyright

 

restrictions

:

 

©

 

2017

2019

 

Transition

 

Networks.

 

All

 

rights

 

reserved.

 

No

 

part

 

of

 

this

 

work

 

may

 

be

 

reproduced

  

or

 

used

 

in

 

any

 

form

 

or

 

by

 

any

 

means

 ‐ 

graphic,

 

electronic

 

or

 

mechanical

 ‐ 

without

 

written

 

permission

 

from

 

Transition

 

Networks.

 

 

 

 

Содержание NM2-GXE-2230-01 Series

Страница 1: ...s 13 Compliance Information 13 Declaration of Conformity 14 Record of Revisions 14 Introduction The Transition Networks NM2 GXE 2230 xx 01 and 01 D are 1 Gigabit Ethernet Fiber NICs supporting the PCI Express M 2 specification They are designed to install in the Dell OptiPlex 7040 and 7050 Micro PCs and the Wyse 7000 Series thin clients M 2 is known as the next generation form factor and is a spec...

Страница 2: ... PCs and the Wyse 7000 Series thin clients The NM2 GXE 2230 xx 01 or NM2 GXE 2230 xx 01 D consist of a M 2 NIC that installs into the OptiPlex Micro PC s M 2 E key interface a fiber optic adapter that installs into the OptiPlex Micro PC s Option port and a 20 pin Flat Flex Cable FFC with right angle bend that connects the NIC to the fiber adapter The fiber optic adapter is available with either a ...

Страница 3: ...iber Optic Adapter Width 1 65 42 mm x Depth 2 05 52 mm x Height 0 51 13 mm FFC Cable Length 6 15 3cm without right angle bend 5 5 14 CM with right angle bend Power Consumption LC 250mA 3 3V 0 8 Watts typical Power Consumption SFP 120mA 3 3V 0 4 Watts typical without SFP module Power Source M 2 interface connector 3 3V refer to Table 41 of M 2 specification Operating Temp 0 C to 45 C 32 F to 113 F ...

Страница 4: ...below diagram See the Dell OptiPlex 7040M Owner s Manual for details 1 Processor 11 Power switch 2 CPU fan connector 12 Hard drive connector 3 Internal speaker connector 13 M 2 socket3 connector 4 Memory module connectors 14 Coin cell battery 5 USB 3 0 connector 15 RJ 45 Ethernet connector 6 Intrusion switch 16 USB 3 0 connector 7 USB 3 0 connector 17 DP VGA daughter board connector 8 Line out con...

Страница 5: ...NM2 GXE 2230 xx 01 Install Guide 33724 Rev C https www transition com Page 5 of 15 NIC Hardware Installation Overview NIC Hardware Location ...

Страница 6: ...NM2 GXE 2230 xx 01 Install Guide 33724 Rev C https www transition com Page 6 of 15 Components Overview Reference Views ...

Страница 7: ...ailure to observe this caution could result in damage to the NIC Before installing the NIC review the Pre Installation Checklist and Safety Precautions below Before installing the NIC ensure that system power is OFF the power cord is unplugged from the power outlet and that proper electrical grounding procedure has been followed WARNING High voltage inside the system may present a safety hazard Ma...

Страница 8: ...card If the NIC is damaged report it to Transition Networks 6 CAUTION Wear a grounding device and observe electrostatic discharge precautions when installing the NIC in a system Failure to observe this caution could result in damage to the NIC Before installing the NIC ensure that system power is OFF the power cord is unplugged from the power outlet and that proper electrical grounding procedures ...

Страница 9: ...Alternatively you can attach the loose end of the FFC cable to the Fiber Optic Adapter and then install the M 2 NIC or the Fiber Optic Adapter 1 Remove PC cover 2 Install the M 2 NIC Assembly with attached cable into Motherboard M 2 Edge Connector 3 Secure the M 2 NIC Assembly into place using the Securing Screw 4 Install the Fiber Optic Adapter into the VGA opening in PC Case as shown below 5 Att...

Страница 10: ...andoff with Top Hole in PC Case 7 Slip 4 Nylon Washer on top of 4 Standoff and insert 4 Screw to secure 8 Tighten using Black SEMS Screw 6 32x1 4 9 Insert the end of 20 Position FFC Cable into fiber optic adapter with Pins facing down 10 See the figure below for final placement 11 Replace PC cover ...

Страница 11: ... Windows Device Manager When you install the Intel PROSet software tabs are automatically added to the supported Intel adapters in Windows Device Manager These features allow you to test and configure wired Intel Ethernet Adapters The links below apply to the NM2 GXE 2230 xx 01 the NM2 FXS 2230 SFP 01 and D versions At each link there is a 32 bit and a 64 bit download for each OS Intel Network Ada...

Страница 12: ...ed duplex protocol or cable type 5 Use the troubleshooting procedures in the Dell OptiPlex User s Guide 6 Use the troubleshooting procedures on the PXE Boot Loader webpage as required 7 Use the troubleshooting procedures on the Intel i210 PROSet Drivers webpage as required 8 Verify that the link partner is active and can send receive traffic make sure partner settings match verify that the port is...

Страница 13: ..._______________________________________________ Connected Device s _____________________________________________________________________________ 3 Provide your TN service contract number ____________________________________________________________ 4 Describe the failure _____________________________________________________________________________ ___________________________________________________...

Страница 14: ...ation of Nuclear Facilities Aircraft Navigation or Aircraft Communication Systems Air Traffic Control Life Support or Weapons Systems High Risk Activities Transition Networks and its supplier s specifically disclaim any expressed or implied warranty of fitness for such High Risk Activities Record of Revisions Rev Date Notes A 6 5 17 Initial release for production B 12 11 17 Update driver informati...

Страница 15: ...NM2 GXE 2230 xx 01 Install Guide 33724 Rev C https www transition com Page 15 of 15 ...

Отзывы: