![Transition Networks BFFG1XXX-1XX Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/transition-networks/bffg1xxx-1xx/bffg1xxx-1xx_user-manual_1151483025.webp)
Transition Networks
Section II:
Hardware Installation
Introduction
This section describes how to install the CFBRM and CBFFG Devices into a Point
System chassis with a remotely managed SFBRM or CFBRM standalone Device.
Also, shows how to install two SFBRM Devices or two SBFFG standalone Devices
on a network, one as a local Device and the other as a remotely managed Device.
Caution
When handling chassis Devices observe electrostatic discharge precautions.
This requires proper grounding; i.e., wear a wrist strap. Failure to observe this
caution could result in damage to the chassis Device.
In this section
These are the topics:
Topic
See Page
Installing CFBRM/CBFFG Devices into a point system chassis
18
Installing SFBRM/SBFFG standalone models
19
Installing copper and fiber cables
20
Connecting power
(standalone models)
22
24-Hour Technical Support: 1-800-260-1312 International: 00-1-952-941-7600
17