RT-SVX33E-EN
17
Unit Weights
Rigging
Refer to
Figure 14
and
Table 3
for typical unit operating
weights rigging before proceeding.
1.
Remove the shipping crate from around the unit. Do
not remove the crating from the top of the unit.
2. Rig the unit as shown in
Figure 14
. Attach adequate
strength lifting slings to all four lifting brackets in the
unit base rail. Do not use cables, chains, or slings
except as shown.
3. Install a lifting bar, as shown in
Figure 14
, to protect the
unit and to facilitate a uniform lift. The minimum
distance between the lifting hook and the top of the
unit should be 7 feet.
4. Test-lift the unit to ensure it is properly rigged and
balanced, make any necessary rigging adjustments.
5. Lift the unit and position it into place.
6. Downflow units; align the base rail of the unit with the
curb rail while lowering the unit onto the curb. Make
sure that the gasket on the curb is not damaged while
positioning the unit.
Table 3.
Typical unit weights and point loading data
Corner Weights
(lbs.)
Center of
Gravity (in.)
Unit
Description
Net
Weight
A
B
C
D
Length Width
WS*150
1978
633 514 376 455
56
36
WS*155
1982
634 515 377 456
56
36
WS*180
1982
634 515 377 456
56
36
WS*200
2107
674 485 400 590
57
35
WS*240
2107
674 485 400 590
57
35
Note:
Corner weights are given for information only. Unit is to be supported
continuously by a curb or equivalent frame support.
WARNING
Heavy Objects!
Ensure that all the lifting equipment used is properly
rated for the weight of the unit being lifted. Each of the
cables (chains or slings), hooks, and shackles used to
lift the unit must be capable of supporting the entire
weight of the unit. Lifting cables (chains or slings) may
not be of the same length. Adjust as necessary for even
unit lift. Other lifting arrangements could cause
equipment or property damage. Failure to follow
instructions above or properly lift unit could result in
unit dropping and possibly crushing operator/
technician which could result in death or serious injury.
WARNING
Improper Unit Lift!
Test lift unit approximately 24 inches to verify proper
center of gravity lift point. To avoid dropping of unit,
reposition lifting point if unit is not level. Failure to
properly lift unit could result in unit dropping and
possibly crushing operator/technician which could
result in death or serious injury and possible equipment
or property-only damage.
Figure 14.
Rigging and center of gravity data