UNT-SVU011C-XX
MB
4
2
9
ADDRESS
1
6
4
ON
ON
1
3
8
6
KD1
3
5
10
2
CONFIGURATION
5
7
KD2
V2
V3
N
V1
JP7B JP7A
GN
BK
6 speed
50Hz
230V
M
OG
BK
RD
M M
WH
YE
AT
C1
L
BK
OG
RD
BU
DIP N°1 = OFF
230Vac 50Hz
L
4
D0
2
L N
N
JP7
D0
Y
JP8
JP6
PE
3
1
1
J3
2
POMPA
CRY
B3
BN
0
T2
T1
T2
J8
JP4B
J9
WH
7
F1
F2
B2
BN
JP4A
D-
D+
6
5
JP1
J5
MC1
F1
JP2
0
WH
J1
D-
D+
JP3
T3
F2
M1
3
1
2
J2
10
JP9
0
T2
WH
BN
J2
CLOSED
TH2O<30°C
TH2O>20°C
- ESTATE
- SUMMER
- ETE'
- SOMMER
- VERANO
- ZOMER
TH2O<20°C
- INVERNO
- WINTER
- HIVER
- WINTER
- INVIERNO
- WINTER
- SOLO VENTILAZIONE
- FAN ONLY
- VENTILATION SEULE
- NUR BELUFTUNG
- SOLO VENTILACION
- ALLEEN VENTILATIE
TH2O>30°C
CHANGE OVER
JP2
T2
T2
WH
T2
BN
Impianto a 2 tubi / 2 pipe units
Installation à 2 tubes / 2-Leiter-Anlage
Instalación a 2 tubos / Installatie met 2 leidingen
SCHEMI
DI COLLEGAMENTO
F
an
C
oIl
Con
M
otore
a
sInCrono
a
3 V
eloCItà
CONNECTION
DIAGRAMS
F
an
C
oIl
wIth
t
hree
- s
peed
a
synChronous
M
otor
17
Содержание UNT-SVU011C Series
Страница 120: ...UNT SVU011C XX DIMA DI FORATURA DRILLING JIG GABARIT DE PERCAGE BOHRSCHABLONE ESCANTILL N PARA PERFORAR BOORSJABLOON 64...
Страница 121: ...UNT SVU011C XX NOTES 64A...
Страница 122: ...UNT SVU011C XX NOTES 65...
Страница 123: ...UNT SVU011C XX NOTES 65A...