10
UHAA-IOM-1E
Wiring Schematics
1.
Bring service leads in through knockouts "K" (Figures 2 and 3) on top or bottom of wall box for
flush-mounting the heater. Bring service leads in through bottom knockouts "K" only for
surface-mounting the heater. When bringing wiring in from the bottom, install wires through
cover "G" by removing screw "H".
2. Connect service leads to two black leads on 208V/240V models; connect to black and white leads
on 120V/277V models. Connect ground lead to green wire with approved connectors.
3. Attach wiring compartment cover "D" to heater assembly with screw "C". Refer to Figure 2 and 3.
Junction box volume = 52 CI (1321 mm)
Wiring Schematics
Figure 4.
Standard UHAA Unit
Table 1.
UHAA Unit Electrical Data
Model
Number
Watts
Btu/Hr. Output
UHAA-15
1,500
5,119
UHAA-02
2,000
6,825
UHAA-03
3,000
10,250
UHAA-04
4,000
13,650
UHAA-48
4800
16,380
Содержание UHAA-02
Страница 14: ...Notes ...
Страница 15: ......