Pre-Start

RT-SVX38C-EN

31 

Test Modes

There are three methods in which the “Test” mode can be 
cycled at LTB-Test 1 and LTB-Test 2.

1.

Step Test Mode—This method initiates the different 
components of the unit, one at a time, by temporarily 
shorting across the two test terminals for two to three 
seconds. For the initial start-up of the unit, this method 
allows the technician to cycle a component “On” and 
have up to one hour to complete the check.

2. Resistance Test Mode—This method can be used for 

start-up providing a decade box for variable resistance 
outputs is available. This method initiates the different 
components of the unit, one at a time, when a specific 
resistance value is placed across the two test 
terminals. The unit will remain in the specific test mode 
for approximately one hour even though the 
resistance is left on the test terminals.

3. Auto Test Mode—This method is not recommended 

for start-up due to the short timing between individual 
component steps. This method initiates the different 
components of the unit, one at a time, when a jumper 
is installed across the test terminals. The unit will start 
the first test step and change to the next step every 30 
seconds. 

At the end of the test mode, control of the unit will 
automatically revert to the applied “System” control 
method.

For unit test steps, test modes, and step resistance values 
to cycle the various components, refer to 

Table 9, p. 31

ReliaTel™ Controls

Upon power initialization, the Gas Ignition Module (IGN) 
performs self-diagnostic checks to ensure that all internal 
controls are functional. It also checks the configuration 
parameters against the components connected to the 
system. The System LED located on the IGN module is 
turned on within one second of power-up if internal 
operation is okay. 

Table 9.

Service test guide for component operation

Test 

Step

Mode

Fan

Econ 

(a)

Comp 1 Comp 2

Heat 1

Heat 2

Resistance

PWM 

Output

(b)

Multi-Speed Fan 

Output

1

Fan

On

Minimum 

Position 

Setpoint 0%

Off

Off

Off

Off

2.2K

50%

low

Minimum

Ventilation

On

Selectable

Off

Off

Off

Off

2

Economizer

Test Open

On

Open

Off

Off

Off

Off

3.3K

50%

(c)

low

3

Cool 

Stage 1

On

Minimum

Position

On 

(d)

Off

Off

Off

4.7K

82%

low

4

(e)

Cool 

Stage 2

On

Minimum

Position

On

(d)

On

(d)

Off

Off

6.8K

100%

High (2-step cooling)

Low (3-step cooling)

5

(e)

Cool 

Stage 3

On

Minimum

Position

On

(d)

On

(d)

Off

Off

8.2K

100%

High 

6

(e)

Reheat

On

Minimum

On

On

Off

Off

33K

100%

(f)

High

7

(e)

Heat

Stage 1

On

Minimum

Off

Off

On

Off

10K

100%

High

8

(e)

Heat

Stage 2

On

Minimum

Off

Off

On

On

15K

100%

High

(a) The exhaust fan will turn on anytime the economizer damper position is equal to or greater than the exhaust fan setpoint.

(b) The PWM Output is in reference to the user selected maximum unit fan speed.

(c) Regardless of the Economizer Mode configuration, the unit will run the Supply Fan at the minimum speed during the Economizer step of the Service 

Test.

(d) The condenser fans will operate any time a compressor is on, providing the outdoor air temperatures are within the operating values.

(e) Steps for optional accessories and non-applicable modes in unit will be skipped.

(f) Units with Enhanced Dehumidification only will not perform this step during Service Test.

Содержание RT-SVX38C-EN

Страница 1: ...owledge and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the li...

Страница 2: ...icates a potentially hazardous situation which if not avoided could result in minor or moderate injury It could also be used to alert against unsafe practices NOTICE Indicates a situation that could r...

Страница 3: ...t written permission Trane reserves the right to revise this publication at any time and to make changes to its content without obligation to notify any person of such revision or change Trademarks Al...

Страница 4: ...Start 29 Voltage Imbalance 29 Electrical Phasing Three Phase Motors 29 Test Modes 31 Unit Start Up 32 Verifying Proper Air Flow 32 Economizer Start Up 32 Compressor Start Up 33 Final System Setup 33 M...

Страница 5: ...Talk communications interface Digit 22 Refrigeration System Option 0 Standard refrigeration system5 Digit 23 Refrigeration Controls Note Applicable to digit 7 E 0 No refrigeration control2 1 Frostat 6...

Страница 6: ...l characteristics refrigerant charge as well as other pertinent unit data Compressor Nameplate The nameplate for the compressors are located on the side of the compressor Unit Description Before shipm...

Страница 7: ...ntial across the return air filters It is mounted in the filter section and is connected to the RTOM A diagnostic SERVICE signal is sent to the remote panel if the pressure differential across the fil...

Страница 8: ...sensor BAYSENS077 Programmable Zone Sensor BAYSENS119 This 7 day programmable sensor features 2 3 or 4 periods for Occupied or Unoccupied programming per day If the power is interrupted the program i...

Страница 9: ...cutout setpoint Evaporator Frost Control ReliaTel Option This input incorporates the Frostat control FOS mounted in the indoor coil circuit and can be activated by closing a field supplied contact in...

Страница 10: ...ances necessary to assure adequate serviceability cataloged unit capacity and peak operating efficiency Providing less than the recommended clearances may result in condenser coil starvation short cir...

Страница 11: ...ons standard efficiency Notes 1 All dimensions are in inches millimeters 2 NPT Gas Connection Figure 3 5 tons standard efficiency roof curb Note All dimensions are in inches millimeters 7 44 44 MM MM...

Страница 12: ...38C EN Figure 4 5 tons standard efficiency unit clearance and roof opening Note All dimensions are in inches millimeters CLEARANCE 36 914 MM Figure 5 6 7 tons standard efficiency Note All dimensions a...

Страница 13: ...6 6 7 tons standard efficiency roof curb Note All dimensions are in inches millimeters 2130 MM 356 MM Figure 7 6 7 tons standard efficiency unit clearance and roof opening Note All dimensions are in...

Страница 14: ...fficiency Note All dimensions are in inches millimeters 1 2 NPT GAS CONNECTION 80 mbh 120 mbh 3 4 NPT GAS CONNECTION 150 mbh 200 mbh 250 mbh YC MODELS Figure 9 8 to 10 tons standard efficiency roof cu...

Страница 15: ...Unit Dimensions RT SVX38C EN 15 Figure 10 8 to 10 tons standard efficiency unit clearance and roof opening Note All dimensions are in inches millimeters...

Страница 16: ...to the state of California to cause cancer through inhalation Glass wool fibers may also cause respiratory skin or eye irritation WARNING Heavy Objects Ensure that all the lifting equipment used is p...

Страница 17: ...ximum unit and corner weights lbs kgs and center of gravity dimensions in mm gas electric models Unit Model No Maximum Model Weights a Corner Weights b Center of Gravity in mm Tons Shipping Net A B C...

Страница 18: ...w during operation as well as proper operation of the condensate overflow switch if equipped the unit and curb must be level If the unit is elevated a field constructed catwalk around the unit is stro...

Страница 19: ...fy that the installation location of the unit will provide the required clearance for proper operation Assemble and install the roof curb if applicable Refer to the latest edition of the curb installe...

Страница 20: ...o TCO 1 instructions TCO1 Instructions Unit Model Number YSC060ED H If the unit being installed is YSC060ED H the limit control TCO1 must be replacedwiththe extra limit control shipped in the heater c...

Страница 21: ...the following figure for proper tube positioning based on unit tonnage 6 After completing installation of the duct covers for horizontal discharge proceed to TCO 1 instructions TCO1 Instructions Unit...

Страница 22: ...1 Remove evaporator access panel and supply air access panels 2 Remove the support panel that the condensate drain pan exits through 3 Slide the condensate drain pan out of the unit and rotate 180 4...

Страница 23: ...n of the applicable electrical service entrance is illustrated in Unit Dimensions p 10 Complete the unit s power wiring connections at Compressor Contactor 1 CC1 inside the unit control panel Refer to...

Страница 24: ...refer to Unit Dimensions p 10 for the electrical access locations provided on the unit Table 5 p 24 lists the conductor sizing guidelines that must be followed when interconnecting the DC binary outp...

Страница 25: ...mber of remote sensors is required Example 2 illustrates three sensors squared in a series parallel circuit Using BAYSENS077 two sensors are required to accomplish space temperature averaging Example...

Страница 26: ...Installation 26 RT SVX38C EN Figure 28 Examples...

Страница 27: ...38C EN 27 Figure 29 Typical field wiring diagrams for optional controls ReliaTel only BAYSENS075 BAYSENS075 BAYSENS119 BAYSENS110 BAYSENS108 BAYSENS106 BAYSENS073 BAYSENS074 BAYSENS075 ASYSTAT669A OPT...

Страница 28: ...Pipe Pipe 1 Pipe 1 Pipe 1 Pipe 15 76 176 345 750 1220 30 52 120 241 535 850 45 43 99 199 435 700 60 38 86 173 380 610 75 77 155 345 545 Note Capacity of pipe of different diameters and lengths in cu f...

Страница 29: ...much as a 20 current imbalance with a resulting increase in motor winding temperatures that will decrease motor life If the voltage imbalance is over 2 notify the proper agencies to correct the volta...

Страница 30: ...wer disconnect switch and the unit mounted disconnect switch if applicable Note Upon closing main power disconnect and the unit mounted disconnect switch or circuit breaker the phase monitor will veri...

Страница 31: ...rforms self diagnostic checks to ensure that all internal controls are functional It also checks the configuration parameters against the components connected to the system The System LED located on t...

Страница 32: ...edure Economizer Start Up ReliaTel Control Using the Service Test Guide in Table 9 p 31 momentarily jump across the Test 1 and Test 2 terminals on LTB1 one time to start the Minimum Ventilation Test 1...

Страница 33: ...n the heating mode Momentarily jump across the Test 1 and Test 2 terminals on LTB1 one additional time if continuing from previous component start up or until the desired start up component Test is st...

Страница 34: ...deflection force must not exceed the maximum force value shown in Table 10 7 Recheck the belt tension at least twice during the first 2 to 3 days of operation Belt tension may decrease until the new...

Страница 35: ...state and local laws Heating Season Inspect the unit s air filters If necessary clean or replace them Check supply fan motor bearings repair or replace the motor as necessary Inspect both the main un...

Страница 36: ...it still appears to be dirty repeat Steps 6 and 7 9 Reinstall all of the components and panels removed in Step 1 and any protective covers installed in Step 2 Note For units equipped with hail guards...

Страница 37: ...tions ___________________________________________ Table 11 Sample maintenance log Refrigerant Circuit 1 Refrigerant Circuit 2 Date Current Ambient Temp F C Compr Oil Level Suct Press Psig kPa Disch Pr...

Страница 38: ...e troubleshooting Refer to the sequence of operations for each mode to assist in verifying proper operation Make the necessary repairs and proceed to Steps 7 and 8 7 If no abnormal operating condition...

Страница 39: ...between terminals J6 7 and J6 6 Heat operating approximately 32 VDC Heat off less than 1 VDC approximately 0 75 VDC Heating failure voltage alternates between 32 VDC and 0 75 VDC Cool Failure Measure...

Страница 40: ...for programmable or digital models and are conducted with the Zone Sensor Module electrically removed from the system Test 1 Zone Temperature Thermistor ZTEMP This component is tested by measuring the...

Страница 41: ...economizer and condenser fan cycling functions are disabled 1 Open and lock the unit disconnect switch 2 Remove the Outside Air Sensor OAS from the condenser section of unit 3 Use 2 wire nuts to indi...

Страница 42: ...lains resetting the system at the unit Resetting Lockouts Method 1 To reset the system from the space turn the Mode selection switch at the thermostat to the OFF position After approximately 30 second...

Страница 43: ...12 0110 4366 1005 0104 4366 1543 0110 060EDR 4366 1015 0104 4366 1005 0104 4366 1540 0110 072EDR 4366 1015 0104 4366 1005 0104 4366 1540 0110 090EDR 4366 1042 0110 4366 1034 0110 4366 1532 0110 102EDR...

Страница 44: ...LIED IN LAW OR IN FACT INCLUDING IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR PARTICULAR USE AND IN NO EVENT SHALL WARRANTOR BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES Some states...

Страница 45: ......

Страница 46: ......

Страница 47: ......

Страница 48: ...controls and HVAC systems comprehensive building services and parts For more information visit www Trane com Trane has a policy of continuous product and product data improvement and reserves the righ...

Отзывы: