![Trane Pivot BAYSTAT814 Series Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/trane/pivot-baystat814-series/pivot-baystat814-series_installation-operation-and-maintenance-manual_1150351011.webp)
BAS-SVX078E-EN
11
Note:
Ensure all wires extend through the hole in the sub-base as shown below.
Wiring
1. Adjust the length and position of each wire so they reach the proper terminal on the connector block
of the sub-base.
2. Strip away 0.25 inch of insulation from each wire. Do not allow adjacent wires to short together when
connected.
3. Match and connect the unit wires to the proper terminals on the connector block.
4. Push excess wire back into the wall and seal the drilled hole to prevent air leaks.
5. Attach the unit to the sub-base.
6. Turn on power to the cooling/heating equipment.
Содержание Pivot BAYSTAT814 Series
Страница 46: ...46 BAS SVX078E EN Notes...
Страница 47: ...BAS SVX078E EN 47 Notes...