Installation - Mechanical
CLCH-SVX013B-EN
27
Flashing Installation
For additional information, see
.
For hood installations, see
1. See
. Apply Butyl tape (Item 8) to
perpendicular-to-airflow flashing (Item 9) and secure
to base rail with screws (Item 4) on front and back of
unit (see Detail A in
2. Apply Butyl tape (Item 8) to direction-of-airflow
flashing (Item 12) and secure to base rails with screws
(Item 4). Start at corners to ensure tight corner seams.
Apply caulk (Item 14) to create water-tight seal (see
Detail A and Detail C in
).
3. Install seam covers (Item 13) to all flashing seams (see
).
If second level of unit is shorter than first level, see
“Flashing Installation for Stacked Unit With Second Level
Shorter Than First,” p. 28
Figure 33.
Flashing installation
(9) Guard:
Perpendicular-to-
airflow flashing
(8) Tape:
0.12T x 1.00W
gray Butyl
(12) Guard:
Direction-of-
airflow flashing
(8) Tape:
0.12T x 1.00W
gray Butyl
(9) Guard:
Perpendicular-to-
airflow flashing
Содержание Performance Climate Changer PSCA
Страница 81: ......