Installation - Mechanical
CLCH-SVX013B-EN
35
4. Attach the unit base L angle from the pipe cabinet to the
5. Attach a U channel to the unit base L angle. Make sure
to clear any coil piping. Make sure to attach enough
nested U channels to comply to the unsupported span.
See Step 5 in
.
6. Locate the pipe cabinet in place, and reinstall the U
channel to the pipe base L angle and reinstall the top U
channel to the nest (see Step 1,
7. When the L angle interferes with the unit base rail
lifting lugs or splice plate, mark and cut L angle section
to clear the component. If excess L angle is not needed
for nested U channel, leave it off. See
Figure 46.
Pipe cabinet installation for hurricane applications
Pipe cabinet wall
removed for clarity
Step 6
L angle attached
to unit baserail
Nested U channel
attached to L angle
Unsupported span
Size 3-50 - 52 in. max
Size 57-120 - 34 in. max
Air handler
Step 7
Step 5
Step 4
5/16-18 x .875 screw
Содержание Performance Climate Changer PSCA
Страница 81: ......