
5
Section 3. Unit Preparation
3.1 Prepare The Unit For Installation
STEP 1 - Check for damage and report promptly to
the carrier any damage found to the unit.
Note:
If the unit must be transported in a horizontal
position, it must be laid on its back (marked “REAR”
on carton).
Note:
Remove the cardboard from the bottom of the
blower. Cut the tie wrap and remove the foam block
located at the motor.
Note:
After the unit is removed from the carton,
release pressure from the coil to verify coil is
pressurized and leak free.
3.2 Unit Accessories
Accessory Number
Description
Fits Cabinet Size
1
BAYECAA05LG1
Electric Heater, 5kW, Lugs, 24V Control, 1 Ph
A1
BAYECAA08LG1
Electric Heater, 8kW, Lugs, 24V Control, 1 Ph
A1
BAYECAA10LG1
Electric Heater, 10kW, Lugs, 24V Control, 1 Ph
A1
BAYSFSCABAA
Supply Duct Flange A1
1
A1
BAYRETFLGAA
Return Duct Flange A
A1
TASB175SB
Plenum Stand with Sound Baffle A
A1
BAYFRKIT100
Front Return Kit
A1
BAYBRFBX100
Bottom Return Filter Box
A1
BAYWMKIT001
Wall Mount Kit
A1
BAYLVKIT100A
Low Voltage Conduit Entry Kit
A1
BAYECPDKIT1A
Pull Disconnect Kit
A1
BAYAHTXV1836
R-22 TXV Conversion Kit
A1
BAYCNDPIP01A
3/4” PVC Threaded Pipe Kit foam seal (10 per box)
A1
1
GAF2A0A18-36 Cabinet is one piece 17.5” wide
Table 3.1
Содержание GAF2A0A18S11EE
Страница 29: ...29 Section 16 Unit Outline Drawing...