
23
STEP 4 - Install a clean-out tee in the primary
drain line for future maintenance. It is recom-
mended that you install a cap on the top of the
tee.
STEP 5 - Insulate the primary drain line to
prevent sweating where dew point temperatures
may be met. (Optional depending on climate
and application needs.)
Provide a means of drainage to prevent winter
freeze-up of condensate line. (Optional depend-
ing on climate and application needs.)
STEP 6 - Support the condensate piping outside
the unit per local codes for proper drainage and
to prevent sagging.
Allow 1/4” of downward slope for each foot of
pipe.
Insulation
Condensate
Piping
Supports
Cap
Tee
1.5” minimum
clearance is
recommended
from cabinet to
inside edge of
tubing
1.5” min.
Содержание GAF2A0A18S11EE
Страница 29: ...29 Section 16 Unit Outline Drawing...