background image

Removal and Installation

COM-SVN01D-EN

17

CSHN/CSHL

Before removing wires

, mark them so that they can be

put back on the same terminal when the new
compressor is installed.

Insure that the compressor model terminals are
installed on the correct terminals (see

Figure 11, p. 17

).

If the compressor is not wired properly, it will shut off
within five seconds.

Proper torque for the terminal set screws and nuts is 30
in-lb.

Before starting the compressor

, check the electrical

phasing with a phase sequence meter similar to an
Ideal-Sperry Model 61-520.

Figure 11.

CSHN/CSHL wiring diagram

CSHD

The terminal blocks have red and blue marks for phase
identification. Compressor terminal T1 is red, compressor
terminal T2 is blue, and compressor terminal T3 is
unmarked. Depending on the unit type, several methods
of marking the wires may be used, colored wires, wire
color marks on the wire or wire numbers to indicated the
proper location of the wire on the compressor terminal
block.

If the wires are not marked, ensure that you mark them
prior to removing them so that they can be reinstalled in
the same position.

Figure 12.

CSHD wiring diagram

Ensure that the compressor model terminals are
installed on the correct terminals (see

Figure 12

).

Proper torque for the terminal screws is 25 in·lb.

Before starting the compressor, check the electrical
phasing with a phase sequence meter similar to an
Ideal-Sperry Model 61-520.

NOTICE

Improper Power Phasing!

Check phasing before starting compressor. Operating
the compressor with improper phasing could cause
compressor failure.

Leak Detection

WARNING

Explosion Hazard!

Failure to follow these instructions could result in death
or serious injury or equipment or property-only
damage.

Use only dry nitrogen with a pressure regulator for
pressurizing unit. Do not use acetylene, oxygen or
compressed air or mixtures containing them for
pressure testing. Do not use mixtures of a hydrogen
containing refrigerant and air above atmospheric
pressure for pressure testing as they may become
flammable and could result in an explosion. Refrigerant,
when used as a trace gas should only be mixed with dry
nitrogen for pressurizing units.

PHASING TO BE CONNECTED AS SHOWN TO
PREVENT REVERSE ROTATION

MODULE INPUT

VOLTAGE

POWER
SUPPLY

CONTROL

CIRCUIT

L1

L3

L2

BLACK

BLUE

RED

L1

L3

L2

A

B

C

L1

L3

L2

M1
NO

M2

COM

CONTROL

VOLTAGE

TH-

S1

TH+

S2

N

L

Blue mark

indicating T2

(Phase B)

Red mark

indicating T1

(Phase A)

Unmarked

T3

(Phase C)

Содержание CSHD

Страница 1: ...on starting up and servicing of heating ventilating and air conditioning equipment can be hazardous and requires specific knowledge and training Improperly installed adjusted or altered equipment by a...

Страница 2: ...nt that is used in these service procedures In addition some states or municipalities may have additional requirements that must also be adhered to for responsible management of refrigerants Know the...

Страница 3: ...gases and extremely corrosive acids WARNING Explosion Hazard Failure to follow these instructions could result in death or serious injury or equipment or property only damage Use only dry nitrogen wit...

Страница 4: ...ed in this document are the trademarks of their respective owners Revision History Updated Model Number Descriptions chapter Updated Torque values table in General Information chapter Updated Oil chan...

Страница 5: ...Inspections 10 Repair Recommendations 11 Mechanical Failure 11 Electrical Failure 12 Two Types of Motor Failures 12 Removal and Installation 13 Removal 13 Compressor Replacement Tandem and Trio Compr...

Страница 6: ...tenance IOM manuals The following table lists these IOMs by unit type Unit Type IOM a a Installation Operation and Maintenance IOM manuals listed here are current as of Februaryl 2015 Check e Library...

Страница 7: ...76 176 MBtu h CSHN 184 184 MBtu h CSHN1 240 240 MBtu h CSHN 250 250 MBtu h CSHN1 315 315 MBtu h CSHN 374 374 MBtu h CSHN CSHL Digit 8 Voltage J 200 230 60 3 K 460 60 3 380 415 50 3 D 575 60 3 X 380 60...

Страница 8: ...it absorbs moistureveryreadily Therefore itisimportanttoproperly handle the oil POE Oil handling guidelines Always use the smallest container size required for the job requirements Always leave the o...

Страница 9: ...transported in the upside position droppedortippedovercouldresultininternaldamageto the compressor and it is recommended that the compressor not be put into service Damage to compressor or packaging...

Страница 10: ...part number Compressor is the correct voltage Compressor ship with items Restrictors for use with tandem and trio compressors Oil equalizer Teflon gaskets WARNING R 410A Refrigerant under Higher Press...

Страница 11: ...em or trio assemblies the suction and discharge lines must NOT be modified except for the use of slip joint couplings Other modification may cause oil return issues and lead to compressor failure Cut...

Страница 12: ...as a mechanical failure Severe If oil test kit is positive with strong pungent odor and dark oil drain and replace oil in all of the non failed compressors Reuse the compressor mounting isolators or...

Страница 13: ...service technician to perform a safe and successful compressor replacement Removal WARNING Pressurized Burning Fluid Failure to follow these instructions could result in death or serious injury Befor...

Страница 14: ...ndem or trio set 1 Only replace the failed compressor 2 On tandem or trio assemblies the suction and discharge lines must not be modified except for the use of slip joint couplings Other modifications...

Страница 15: ...m due to POE oil Remove the rubber plugs only when ready to install the compressor Plug other compressor on tandem or trio compressors Before removing the oil equalizer connection cap place a can pan...

Страница 16: ...osive and could lead to long term problems and equipment damage if not properly removed Tandem two compressors and trio combinations three compressors with uneven compressor combinations requires the...

Страница 17: ...g diagram Ensure that the compressor model terminals are installed on the correct terminals see Figure 12 Proper torque for the terminal screws is 25 in lb Before starting the compressor check the ele...

Страница 18: ...pressurizing the system use an R 410A leak detection device to detect and locate leaks Vacuum Testing and Evacuation Use the procedure as described in the unit Installation Operation and Maintenance...

Страница 19: ...tion and discharge service valves close them during the charging procedure Water chiller units Always operate the chilled water pumps while charging the unit to prevent freezing the evaporator Verific...

Страница 20: ...operating Do not overcharge the unit Recommended system full load superheats unless specified differently in the unit Installation Operation andMaintenancemanual see LiteratureReferenced p 6 is 16 F 2...

Страница 21: ...mpressor superheat subcooling oil sump superheat voltage and amperage Check all of the following on a regular basis System operating conditions System refrigerant charge level Oil levels and oil color...

Страница 22: ...g valve may be stuck and not switched properly bypassing from the high side to the low side of the system this situation is indicated by an extremely warm suction inlet to the compressor Model CSHN374...

Страница 23: ...lywiredintothesystem safety circuit If the motor is believed to be incorrectly phased change two of the three wires PTC Overheat motor over temperature over current Compressor motor drawing too much c...

Страница 24: ...PTC open replace compressor Resistance 0 ohms PTC shorted replace compressor Resistance 2750 ohm Wait until the motor has cooled down and resistance is less than 2750 ohms reconnect and try to reset...

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...are committed to using environmentally conscious print practices Trane by Trane Technologies NYSE TT a global climate innovator creates comfortable energy efficient indoor environments for commercial...

Отзывы: