RLC-SVX023A
3
11
UNT-PRC002-GB
Sound power levels
Discharge
Measurement conditions:
Measurements taken in a room adjacent to the room containing the FWD, at the outlet of the rectangular duct (1.5 m
long) fixed to its discharge opening.
Fan
Power level in dB(A), per Hz frequency band
Overall power
Unit
speed
125
250
500
1000
2000
4000
8000
dB(A)
1
55
50
42
37
37
31
30
46
FWD 08
2
57
54
47
40
30
38
40
50
3
58
57
50
42
32
40
43
53
1
57
51
45
42
34
33
28
48
FWD 10
2
58
54
48
45
38
39
35
51
3
60
58
50
48
40
42
39
54
1
57
51
45
42
34
33
28
48
FWD 12
2
58
54
48
45
38
39
35
51
3
60
58
50
48
40
42
39
54
1
56
62
50
48
39
38
36
56
FWD 14
2
61
66
55
53
47
46
45
60
3
63
69
58
56
50
50
49
63
1
57
63
51
49
40
39
37
57
FWD 20
2
61
66
55
53
47
46
45
60
3
63
69
58
56
50
50
49
63
Intake
Measurement conditions:
Measurements taken at the horizontal air intake.
Fan
Power level in dB(A), per Hz frequency band
Overall power
Unit
speed
125
250
500
1000
2000
4000
8000
dB(A)
1
56
55
55
53
46
45
42
57
FWD 08
2
63
62
60
60
53
53
53
64
3
66
65
63
62
56
55
57
67
1
62
58
55
58
51
48
44
61
FWD 10
2
66
63
60
62
56
55
52
66
3
70
67
63
65
59
59
57
69
1
62
58
55
58
51
48
44
61
FWD 12
2
66
63
60
62
56
55
52
66
3
70
67
63
65
59
59
57
69
1
66
65
65
65
57
50
46
68
FWD 14
2
73
72
69
71
64
59
57
74
3
78
76
73
75
69
64
63
78
1
68
72
64
64
56
52
50
69
FWD 20
2
76
76
68
71
65
61
61
75
3
78
79
71
74
69
66
66
78
Foreword
These instructions are given as a guide to good practice
in the installation, start-up, operation, and maintenance
by the user, of Trane City chiller RTSF, manufactured in
France. A separate manual is available for the use and
maintenance of the unit’s control, Tracer™ UC800. They
do not contain full service procedures necessary for the
continued successful operation of this equipment. The
services of a qualified technician should be employed
through the medium of a maintenance contract with a
reputable service company. Read this manual thoroughly
before unit start-up.
Units are assembled, pressure tested, dehydrated,
charged and tested in accordance with factory standard
before shipment.
Warnings and Cautions
Warnings and Cautions appear at appropriate sections
throughout this manual. Your personal safety and the
proper operation of this machine require that you follow
them carefully. The constructor assumes no liability
for installations or servicing performed by unqualified
personnel.
WARNING: Indicates a potentially hazardous situation
which, if not avoided, could result in death or serious
injury.
CAUTION: Indicates a potentially hazardous situation
which, if not avoided, may result in minor or moderate
injury. It may also be used to alert against unsafe
practices or for equipment or property-damage-only
accidents.
Safety Recommendations
To avoid death, injury, equipment or property damage,
the following recommendations should be observed
during maintenance and service visits:
1. The maximum allowable pressures for system leak
testing on low and high pressure side are given in
the chapter “Installation”. Insure to do not exceed test
pressure by using appropriate device.
2. Disconnect all power supplies before any servicing on
the unit.
3. Service work on the refrigeration system and the
electrical system should be carried out only by qualified
and experienced personnel.
4. To avoid any risk, it is recommended to place the unit
on an area with restricted access.
Reception
On arrival, inspect the unit before signing the delivery
note. Specify any visible damage on the delivery note,
and send a registered letter of protest to the last carrier
of the goods within 7 days of delivery.
Notify the local TRANE sales office at the same
time. The delivery note must be clearly signed and
countersigned by the driver.
Any concealed damage shall be notified by a registered
letter of protest to the last carrier of the goods within
7 days of delivery. Notify the local TRANE sales office
at the same time.
Important notice: No shipping claims will be accepted
by TRANE if the above mentioned procedure is not
respected.
For more information, refer to the general sales
conditions of your local TRANE sales office.
Note: Unit inspection in France. Delay to send registered
letter in case of visible and concealed damage is only
72 hours.
Loose Parts Inventory
Check all the accessories and loose parts that are
shipped with the unit against the shipping list. Included
in these items will be the Water Flow Switch (optional),
rigging and electrical diagrams, service literature, which
are placed inside the control panel and/or starter panel
for shipment.
If optional elastomeric isolators are ordered with
the unit they are shipped mounted on the horizontal
support frame of the chiller. The isolators’ location and
distribution weight diagram is placed with the service
literature inside the starter/control panel.
Warranty
Warranty is based on the general terms and conditions
of the manufacturer. The warranty is void if the
equipment is repaired or modified without the written
approval of the manufacturer, if the operating limits are
exceeded or if the control system or the electrical wiring
is modified. Damage due to misuse, lack of maintenance
or failure to comply with the manufacturer’s instructions
or recommendations is not covered by the warranty
obligation. If the user does not conform to the rules of
this manual, it may entail cancellation of warranty and
liabilities by the manufacturer.
Introduction