Acceptance
When receiving the unit, please carefully check whether the unit is damaged in the transport. If
any, please record it in the delivery note and notify in written form within 72 hours. Notify the
final carrier of the petition in written form within 72 hours, and simultaneously inform the local
Trane sales office. Please thoroughly inspect the unit within 7 days after arrival of the goods. If
any damage is found, please immediately notify the carrier and the local Trane sales office.
Inspect whether the nameplate contents of the unit are correct and whether the operating power
supply is consistent with that on the nameplate of each component. The maximum deviation of
the supply voltage shall not be more than 10%.
Hoisting
Please use a forklift or crane with proper tonnage to handle this unit to its installation location.
Hoisting method:
Table of External Dimensions and Weight Parameters
Model
CXAJ045 CGAJ045 CXAJ065 CGAJ065 CXAJ130 CGAJ130
External Dimensions (mm)
2145*1000*2155
2145*1000*2155
2145*2020*2155
Weight of N Type
700
700
730
730
1320
1320
Weight of H Type
730
725
780
775
1350
1340
Installation location
•
The unit must be installed on a flat and level plane;
•
It is better to install the shockproof rubber cushion, which is arranged between the host unit
and its load to absorb vibration;
•
In the installation, the drainage, ventilation and maintenance space as well as others shall
be considered. Refer to the installation space diagram for the recommended minimum
maintenance space;
•
It is necessary to consider the bearing capacity of the building in the installation to arrange
the unit base