Page 9
INSTALLER'S GUIDE
STEP 8
-
Connect high voltage wiring
1. Connect the wiring to the lugs on the breaker models or
to the terminal block on the lug models as illustrated.
2. Connect the ground wire to the ground lug.
3. Connect the 3-pin plug on the heater to the 3-pin plug in
the air handler case.
Note:
Minimum terminal screw torque is 45 in-lbs.
Field wiring
Factory wiring
Ground
Field
wiring
Factory
wiring
Ground
Breaker Model
LG (lug) Model
Factory
wiring
Field
wiring
BLK
BLK
RED
RED
GREEN
GREEN
STEP 9
-
Install the seal plate. Breaker models only.
1. Place the seal plate over the breaker so the tab on the
right side is in place.
2. Snap on the left side of the seal plate that has the slot
by the tab.
Place over
breaker first
Snap in
place over
breaker
second
Field
wiring
Factory
wiring
Ground
3-Phase Model
Factory
wiring
Field
wiring
BLK
RED
GREEN
Field
wiring