Trane 4NXCA018AC3HCA Скачать руководство пользователя страница 6

 18-AD28D1-2

Installer’s Guide

G. FURNACE IN HORIZONTAL RIGHT POSITION 

CAUTION

!

Both the coil and furnace must be fully supported. Do not 

attempt to suspend the coil using the brackets.

1.  HORIZONTAL RIGHT COIL CONVERSION (For 

4NXCD063 Coil Only).

 

a. For the horizontal right configurations the two-piece 

factory baffle must be removed and the top baffle re-

placed for maximum efficiency. 

b. Remove the factory installed two-piece baffle assem-

bly from the apex of the coil by removing the 5/16” hex 

head screws.  See Figure 14.

 

c. Replace only the top baffle using the same screws 

previously removed.  

d. The (2) outer water diverter baffles must be removed 

for maximum efficiency.

 

e. Remove the coil by sliding the coil out of the coil 

enclosure.

 

f. Remove the (2) outer water diverter baffles by remov-

ing the 5/16” hex head screws.  See Figure 15.

IMPORTANT: 

The 4NXC cased coil must be placed downstream of the 

furnace, with the apex of the coil always pointing opposite 

the direction of the airflow for horizontal right installation.  

This placement supersedes previous furnace Installer's 

Guide stating install "with the apex of the coil pointing in 

the direction of airflow for horizontal application."  See 

Figure 16.

2. When the noncondensing Upflow/Horizontal furnace is 
placed on its right side for right airflow, the furnace top 
flange meets the cased coil top flange.  The coil flange fits 
inside of the furnace flange.  See Figure 17. 

3.  There are three holes in the furnace top flange which 
can be used for pilot holes to connect and align the furnace 
and coil.  There are self drilling screws included which 
can be used for this connection.  Seal all gaps between the 
furnace and coil.

UPFLOW MODEL IN 

HORIZONTAL RIGHT AIRFLOW POSITION

Airflo

w

 

Co

mf

or

TM

 

co

il

CASED COIL

Co

mf

or

TM

 

co

il

Figure 16

CASED

COIL

UPFLOW

FURNACE

TOP COIL FLANGE
FITS INSIDE OF

FURNACE

TOP FLANGE FOR
HORIZONTAL RIGHT
APPLICATION

UPFLOW

Figure 17

Figure 14

Figure 15

Remove
and 
Discard

Replace

CAUTION

!

Coil is pressurized with 10 to 20 psi nitrogen.  Remove 

the valve core on the pressure tap to release the pres-

sure before un-sweating the tubing caps.  If no pressure 

is released, check for leaks.  

Содержание 4NXCA018AC3HCA

Страница 1: ...ile Home use The height of the Furnace Coil and discharge duct work must be 7 ft or less Inspect the coil for shipping damaged Notify the transporta tion company immediately if the coil is damaged B A...

Страница 2: ...ews See Figure 2 b Replace only the top baffle using the same screws previously removed c The 2 outer water diverter baffles and the two piece factory baffle must be removed and the top baffle replace...

Страница 3: ...same screws previously removed c Installation of the 1 2 wide gasket behind the front and back triangular baffles is required for downflow ap plications d Remove the coil by sliding the coil out of t...

Страница 4: ...ombustible flooring a Place the coil case on the furnace supply air ple num b Secure the coil case to the plenum c Set the furnace on top of the coil case making sure that the back side of the dischar...

Страница 5: ...brackets for coil furnace alignment are included with the furnaces a In horizontal left the 4NXC coil case is rotated so the apex of the coil is away from the furnace and the auxiliary drain pan is no...

Страница 6: ...rflow for horizontal right installation This placement supersedes previous furnace Installer s Guide stating install with the apex of the coil pointing in the direction of airflow for horizontal appli...

Страница 7: ...ANT LINES 1 The following steps are to be considered when installing the refrigerant lines a Determine the most practical way to run the lines b Consider types of bends to be made and space limita tio...

Страница 8: ...he drain line to prevent sweating and dripping It is always recommended that an auxiliary drain pan be in stalled under a horizontally installed evaporator coil or 90 gas furnace Connect the auxiliary...

Страница 9: ...2 18 1 4 22 1 2 OVERALL WIDTH B IN 14 1 2 17 1 2 17 1 2 OPENING WIDTH C IN 13 5 8 16 5 8 16 5 8 TOP OPENING D 12 3 4 15 3 4 15 3 4 GAS CONNECTION 3 4 BRAZE LIQUID CONNECTION 3 8 BRAZE MATCHED FURNACE...

Страница 10: ...ARY DRAIN 3 4 NPT FOR VERTICAL POSITION PRIMARY DRAIN 3 4 NPT FOR VERTICAL POSITION 18 1 8 OPENING IN WRAPPER 21 1 2 3 1 8 7 8 19 3 8 MODEL 4NXCD063BC3HCA WEIGHT LBS 80 REFRIGERANT CONTROL TXV NON BLE...

Страница 11: ...the refrigerant system 17 Charge the system per the charging instructions with the outdoor unit P TXV CHANGE OUT 1 Unbraze the liquid line field connection 2 Remove the front panel and manifold panel...

Страница 12: ...decrease Measure superheat at indoor coil while placing the bulb in an ice and water bath for one minute Does superheat increase YES Replace the TXV NO TXV is OK NO Is superheat 20F NO YES NO Is indoo...

Отзывы: