CHECKOUT PROCEDURES

After installation has been completed, it is recommended that the Air Handler be checked against the following checklist.
1. Make sure power is “OFF” at power disconnect switch. 
2. Check all field wiring for tight connections. See that grounding of unit is in accord with code.
3. Make sure unit suspension (if used) is secure and that there are no tools or loose debris in, around or on top of the unit.
4. Check all duct outlets; they must be open and unrestricted. 
5. Check drain lines and be sure all joints are tight.
6. Make sure secondary drain pan is installed. 
7. Check power supply for correct requirements per unit nameplate.
8. All central air conditioning and heating systems require a return air filter (not included) to operate properly. Make sure a return air filter is installed.
9. Check filters for proper size. Inform owner of proper procedure for removal and reinstallation. 
10. Energize the system and carefully observe its operation; make any necessary adjustment. 
11. Instruct owner, engineer (if possible) on proper operating procedure and leave Use and Care Manual with owner. 

SUPPLEMENTARY HEATERS CHECKOUT PROCEDURES 

IF a heater is USED, see "limitations and recommendations" 

to determine if the heater requires a SPECIAL CIRCUIT.

1.  Be sure the disconnect switch is “OFF”, and safety label (if any) is attached. 

 

 

2.  Check on field wiring for tight connections and grounding according to codes. 

 

3.  Check circuit protection for proper size per nameplate specifications. 

 

 

4.  Check control box panel — in place and secured. 

 

NOTE: OPERATION OF HEATERS MUST BE CHECKED DURING THE OPERATIONAL CHECK OF THE TOTAL SYSTEM. 

 

CHECKOUT PROCEDURE

1.  Check the Air Handler installation in accordance with this Installer's Guide.
2.  “Operational Procedure” for the system installation can be found in the outdoor unit installer guide and will be compatible with this Air Handler.

Airflow Performance 

2/4TGB3F48A1000A: Wet coil, No Heaters

EXTERNAL  

STATIC

PRESSURE

(in.w.g.)

AIRFLOW (CFM)

VERTICAL

HORIZONTAL

230 VOLTS 

208 VOLTS

230 VOLTS 

208 VOLTS

HIGH

M-HI

LOW

HIGH

M-HI

LOW

HIGH

M-HI

LOW

HIGH

M-LO

LOW

0

1917

1664

1309

1836

1473

1101

1787

1645

1391

1751

1510

1134

0.1

1830

1615

1308

1767

1447

1108

1715

1579

1366

1678

1465

1157

0.2

1751

1561

1287

1698

1413

1102

1637

1519

1329

1606

1418

1138

0.3

1675

1501

1256

1627

1372

1086

1555

1454

1282

1532

1362

1102

0.4

1596

1437

1218

1551

1322

1059

1472

1376

1223

1451

1295

1062

0.5

1511

1366

1173

1470

1263

1022

1387

1284

1153

1363

1215

1024

0.6

1420

1289

1118

1382

1192

972

1298

1181

1072

1266

1125

983

0.7

1323

1202

1045

1288

1106

905

1201

1075

981

1163

1027

926

0.8

1223

1104

942

1188

1000

817

1091

980

881

1055

929

830

0.9

1126

992

794

1086

869

702

962

911

775

947

840

663

NOTES:

With filter, no horizontal drip tray - Small apex baffle

As shipped, with filter

Содержание 2/4TGB3F018A

Страница 1: ... Regulations Chapter XX Part 3280 or the equivalent SUIT ABLE FOR MOBILE HOME USE For proper installation the following items must be considered 1 If adequate power is available and correct according to nameplate specifica tions 2 Pursuant to Florida Building Code 13 610 2 A 2 1 this unit meets the criteria for a factory sealed air handler 3 Insulate and seal all ducts particularly if unit is loca...

Страница 2: ...g as the unit is supported from both ends as well as the middle to prevent sagging and service access is not obstructed e If the unit is not suspended it must be isolated carefully to prevent sound trans mission Vibration isolators purchased locally must be placed under the unit C DUCT CONNECTIONS The supply and return air ducts should be connected to the unit with flame retardant duct connectors ...

Страница 3: ...he outside of the air handler and the conduit terminated to it The electrical connections are made using the two power leads and ground wire connections which are located near the discharge of the blower NOTE If air handler is used with or without a heater the 7 8 electrical entry hole as well as any other cabinet penetrations must be sealed air tight WARNING ELECTRICAL SHOCK HAZARD LOCK OUT UNIT ...

Страница 4: ... 419 364 198 468 418 277 401 357 191 0 9 385 347 164 322 263 78 378 335 172 316 267 75 NOTES With filter no horizontal drip tray Small apex baffle As shipped with filter Airflow Performance 2 4TGB3F25A1000A Wet coil No Heaters EXTERNAL STATIC PRESSURE in w g AIRFLOW CFM VERTICAL HORIZONTAL 230 VOLTS 208 VOLTS 230 VOLTS 208 VOLTS HIGH MED LOW HIGH MED LOW HIGH MED LOW HIGH MED LOW 0 1035 965 773 92...

Страница 5: ... 1007 930 0 3 1156 1066 1001 1105 980 895 1099 1012 975 1062 955 902 0 4 1101 1018 958 1054 941 863 1044 946 917 1009 901 858 0 5 1043 968 910 1000 896 826 986 888 860 952 845 797 0 6 981 911 857 939 841 781 922 832 800 889 785 722 0 7 911 843 793 866 776 721 843 768 731 813 715 641 0 8 832 757 713 773 697 636 738 676 641 717 627 568 0 9 739 641 610 649 603 511 593 531 517 592 510 520 NOTES With f...

Страница 6: ...6 18 GJ02D1 2 Installer s Guide OUTLINE DRAWING FOR 2 4TGB3F18 36A D810094REV05 ...

Страница 7: ...18 GJ02D1 2 7 Installer s Guide D810126REV04 OUTLINE DRAWING FOR 2 4TGB3F42 48A ...

Страница 8: ...limitations and recommendations to determine if the heater requires a SPECIAL CIRCUIT 1 Be sure the disconnect switch is OFF and safety label if any is attached 2 Check on field wiring for tight connections and grounding according to codes 3 Check circuit protection for proper size per nameplate specifications 4 Check control box panel in place and secured NOTE OPERATION OF HEATERS MUST BE CHECKED...

Отзывы: