![TouchWand WallWand Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/touchwand/wallwand/wallwand_programming-manual_1140393007.webp)
This cocument belong to TouchWand Ltd. Last updated- March 22
nd
2018
---
7
-----
Power switch connections
The voltage must be removed at the home or in the room where the
installation will be carried out, prior to installation
Connecting the backend unit
Concrete box recommended
MicroSD card
Switch and Frame
Electrical connections to the back connections
Each switch or shutter button will
receive the number of the relay and
the following should be observed
:
1. The TOUCH backend wiring will be
carried out from relay to 6 in
ascending order. It is best not to skip
relays and not to leave non-wired
relays when wired relays are
followed
.
2
.
If a second or third relay is
required, an icon should be loaded in
any case for the first unwired
transmitters and remove the "V" to
be invisible on the screen
.
3
.
When loading the icons of the
shutters, always load the shutter
button before the shutter download
button, and the wires must be
wired
.
Setting the switch
Enter the app at the following link: http://cloud.touchwand.com/tp_json/index_s1.html#
This is the default app screen.