3. Install the upper bracket
4. Drill pilot holes in the wood frame
A
2
dia.1/8"
(Ø 3mm)
1
1
B
2
dia.1/8"
(Ø 3mm)
Mark the location for drilling pilot holes for the screws to secure the carrier to the
wood frame.
There are six (6) screws for the side (3 on each side) and two on the feet. Make
sure the carrier is flush with the wood frame before placing the markings.
Remove the carrier from the wood frame, drill six (6) 1/8"(3mm) holes on the wall
stud (Trimmer/Jack) and two (2) on the subfloor (plywood); for concrete, drill 3/8"
(10mm) holes for anchors.
For vertical drain installation, clip the
upper bracket to the front slot of the
frame as shown.
For left or right drain installation, clip
the upper bracket to the back slot of
the frame as shown.
Mark
A
A
A
A
A
B
B
A
45°
45°
Front Slot
Back Slot
6
ENGLISH