INSTALLATION PROCEDURE
Installation procedure
Symbols and their meanings
Visual confirmation required.
Loosen the bolts on the adjustable
legs and adjust the carrier to the
desired height with reference to
the Finished Floor (see Table 1
for guide).
Place the carrier so that the front
of the carrier frame is flush with
the front of the supporting wall
frame.
Tighten the two bolts on the
legs to secure the height of the
carrier.
1. Install the discharge pipe
2. Adjust the tank legs
H
Horizontal confirmation
required.
Horizontal
Vertical confirmation
required.
Attach sealing tape
Vertical
Seal
Drill a 3-3/4"(95mm) hole on the
subfloor 1-3/4" (45mm) from the
front of studs.
Mark the location.
Mark
39-3/8”
(1000mm)
1-3/4”(45mm)
FFL
5
ENGLISH