Manual
Page 5
www.totalsheds.co.uk
Assembly Manual
Page 1 of 3
Attach Back Panel 2
Use the 2nd Floor Block to raise the back
panel height then screw against 1st panel side.
Attach Right Side Panel
Now attach the Right Side Panel by placing
against 2nd back panel side as below.
ATTACH BACK PANEL 2 of 2
RIGHT SIDE PANEL
STEP • 5
STEP • 6
(895.5mm)
45.25”
Heigh
t
(1149.35mm)
35.25”
Width
(1790.7mm)
46.5”
Heigh
t
(1181.1mm)
47”
Heigh
t
(1193.8mm)
70.5”
Width
70.5”
Width
3/4
10
P
lanks of Shiplap
(1790.7mm)
DRILL
DRIVER
DRILL
DRIVER
Using the Floor Block Posts, elevate the 2nd
back panel and screw in sides to secure againsts
the 1st back panel side post as shown here.
Using the Floor Block Posts, elevate the right side
panel and screw in sides to secure againsts
the 2nd back panel side post as shown.
Position the 2nd back
panel in place as shown on
diagram below. The back panel
2 must be the same height as the 1st
back panel which is 63mm from the
ground to back panel frame bottom.
BACK PANEL 2
RIGHT PANEL
= Drill Points using
screws provided as shown
x3
4.0 x 70mm
= Drill Points using
screws provided as shown
x3
4.0 x 70mm
© Sheds (Midlands) Limited 2021 •
6x6ft Dog Kennel