background image

Manual 

Page 5

www.totalsheds.co.uk

Assembly Manual 

Page 1 of 3

Attach Back Panel 2

Use the 2nd Floor Block to raise the back

panel height then screw against 1st panel side.

Attach Right Side Panel

Now attach the Right Side Panel by placing 

against 2nd back panel side as below.

ATTACH BACK PANEL 2 of 2

RIGHT SIDE PANEL

STEP • 5

STEP • 6

(895.5mm)

45.25”

 Heigh

t

(1149.35mm)

35.25”

 Width

(1790.7mm)

46.5”

 Heigh

t

(1181.1mm)

47”

 Heigh

t

(1193.8mm)

70.5”

 Width

70.5”

 Width

3/4

10      

 P

lanks of Shiplap

(1790.7mm)

DRILL

DRIVER

DRILL

DRIVER

Using the Floor Block Posts, elevate the 2nd

back panel and screw in sides to secure againsts

the 1st back panel side post as shown here.

Using the Floor Block Posts, elevate the right side 

panel and screw in sides to secure againsts

the 2nd back panel side post as shown.

Position the 2nd back 

panel in place as shown on 

diagram below. The back panel 

2 must be the same height as the 1st 

back panel which is 63mm from the 

ground to back panel frame bottom.

BACK PANEL 2

RIGHT PANEL

= Drill Points using

screws provided as shown

x3

4.0 x 70mm

 

= Drill Points using

screws provided as shown

x3

4.0 x 70mm

 

© Sheds (Midlands) Limited 2021 • 

6x6ft Dog Kennel

Содержание 6x6ft DOG KENNEL

Страница 1: ...completeunit 188 82cm 74 3 Front Width 184 7cm 71 4 Depth 6x6ft DOG KENNEL Ready to Build Dog Kennel Total Sheds 28 Charles Street Willenhall WV13 1HG Tel 01902 636 529 Email info totalsheds co uk Cop...

Страница 2: ...eated Timber DELIVEREDFLATPACKED EASYTOINSTALLSECTIONS Tools Required to Assemble 2 Persons Required PLEASE NOTE Use extreme caution when using any tools Always wear safety gear where necessary It is...

Страница 3: ...e required position area 7x7sqft recommended TIPS ADVICE It is always good to position your kennel on a solid foundation Slabs or Concrete areas are ideal FIXSIDEPOSTTOFLOOR EDGEWITHLARGESCREWS STEP 1...

Страница 4: ...Panel NowplacetheLeftSidePanelflush againsttheBackPanelPost ATTACHBACKPANEL1of2 LEFTSIDEPANEL STEP 3 STEP 4 895 5mm 45 25 Height 1149 35mm 35 25 Width 1790 7mm 1790 7mm 46 5 Height 1181 1mm 47 Height...

Страница 5: ...ER DRILL DRIVER Using the Floor Block Posts elevate the 2nd back panel and screw in sides to secure againsts the 1st back panel side post as shown here Using the Floor Block Posts elevate the right si...

Страница 6: ...olePanel Setwithinthefloorplankssittingflushwith frontandrearpaneledgesandfloor POPHOLE 44 5 Height 1130 3mm 66 8 Width 1699mm 46 25 Height 1174 7mm DRILL DRIVER POP HOLE Manual Page 6 www totalsheds...

Страница 7: ...rstripsprovided ATTACHBACKFRONTPANELA SIDESTRIPS STEP 9 STEP 10 1174 75mm 45mm 46 25 Length 1 77 Width x6 DRILL DRIVER 46 25 Height 1174 75mm 21 1 2 1 Planks of Shiplap 895 35mm 35 25 Width Door Heigh...

Страница 8: ...the roof and the base adjusting where need be to make final structure safe solid Remember to drill the panels down to the floor at this stage as all the build sections are together now Secure roof pa...

Страница 9: ...t of roof then overlay the other 2 sections After cutting away the excess felt neatly fold over the edges and secure each section down by tacking them to the kennel sides PROTECT YOUR KENNEL AGAINST T...

Отзывы: