Preparation of Base
We recommend that the base onto which your building will stand should be at least 75mm larger in
each direction than the total floor size of the building.
Actual floor area of the building: 1250 x 665mm
Total height clearance: 2245mm
The chosen position in your garden for the siting of the building should be excavated to a depth of 75mm
to allow a base of sand, on to which paving slabs can be evenly laid -
THEY MUST BE LEVEL AND
FIRM.
Treatment/Care of your Garden Building
Tools Required
Posidrive screwdriver (electric is best)
Drill, 6 & 3mm drill bits
Sandpaper (to smooth any rough edges)
Tape measure
Step ladder
Pencil
IMPORTANT!
PLEASE READ PRIOR TO ASSEMBLY OF THE BUILDING
WE RECOMMEND THAT PROTECTIVE GLOVES
BE WORN THROUGHOUT
Wood is a natural product and is therefore prone
to changes in appearance, including some
warping, movement and splitting, particularly
during unusual climatic conditions (long hot or
wet spells of weather). As a natural occurrence
this is not covered by a guarantee.
PLEASE NOTE
BUILT AROUND OUR REPUTATION
Batch No
4
223
Treat with a suitable decorative wood finish immediately. We recommend that all timber pieces be
treated again prior to assembly and again within 3 months of assembly. We further recommend that
all pieces are treated again at least annually or as frequently as the instructions on the product used
recommends.
We would suggest that all wall panels be treated in an upside-down position to allow the finish/treatment
to ingress into the tongue and groove jointing.
We would also remind you that you would rarely (if ever) be able to re-treat the underside of the floor
following assembly. We strongly recommend that the underside of the floor is treated an absolute
minimum of twice (not including pre-treatment).
Garden buildings are not waterproof, therefore on assembling building we recommend using a
silicon based sealant between wall panels and between wall panels and floor.
Assembly of
Rose Arbour
EVERY PRECAUTION IS TAKEN TO ENSURE THAT YOUR
BUILDING HAS NO ELEMENT INCORRECTLY PLACED OR POS-
SIBLY HAZARDOUS, HOWEVER PRIOR TO USE PLEASE
CHECK ALL SURFACES FOR THE FOLLOWING:
1 RAISED GRAIN, SPLINTERS: sand down timber to smooth finish.
2 NAIL/SCREW/PIN HEADS PROUD: tap home to be flush with
surface of timber.
3 DAMAGED SCREW HEADS: RESULTING IN SHARP SPLIN-
TERS OF METAL: replace.
4 SHARP ENDS OF NAILS/ SCREWS/PINS PROTRUDING
THROUGH THE PANEL: remove and reposition.
5 ENSURE ALL PARTS ARE SECURED AGAINST REASONABLE
FORCE: remove and refit.
6 ENSURE THERE ARE NO LOOSE PARTS: remove and
refit/discard.
Parts List
QTY DESCRIPTION
1 Back Panel - 1418 x 1120 mm
A
2 Side Panels - 1418 x 538 mm
B
2 Roof Panels - 924 x 722 mm
C
1 Seat Base Panel - 602 x1120 mm
D
1 Seat Back Panel - 524 x 1120 mm
E
1 Outer Trellis Gable Panel - 581 x 1160 mm
F
1 Inner Trellis Gable Panel - 498 x 996 mm
G
2 Outer Trellis Side Panel - 470 x 658 mm
H
2 Inner Trellis Side Panel - 402 x 590 mm
I
1 Seat Support - Back 34x34x1052mm L
1 Roof Framework - 44x44x722mm M
2 Roof Capping 12x100x722mm N
2 Fascia Boards
O
1 Fascia Diamond
P
1 Seat Fascia Board
Q
PLEASE LAY OUT PARTS AND CHECK OFF AGAINST
CHECK LIST BELOW:
57 x 60 mm Screws
12 x 25 mm Screws
14 x 40 mm Nails
17 x 40 mm Screws
4 Cornerposts - 58 x 58 x 1500 mm (Bevelled) J
2 Seat Supports - Sides 34 x 34 x 590 mm
K
NOTE
Trellis H&I fitted
see supplement
29/03/18