2. VBus to Ground Short
3. CC/VCONN to Ground Short
4. VBus to CC/VCONN Short
Test Phase 2
1. Shorts between all other pins
2. Continuity of de
fi
ned and present pins
3. Mis-wires of de
fi
ned and present pins
4. DC resistance of each of the Ground pins at both the "U" and "D" side of the cable
5. Total DC resistance of the Ground connection through the cable
6. DC resistance of each of the VBus pins at both the "U" and "D" side of the cable
7. Total DC resistance of the VBus connection through the cable
8. E-Marker detection and read out
a. From the "U" side of the cable (SOP' and SOP'')
b. From the "D" side of the cable (SOP' and SOP'')
9. Di
ff
erentiate Pair continuity check
10. (Optional) Signal Integrity measurement
Test Phase 3
1. Compare the results from the above testing with the requirements of the pro
fi
le
used and USB Type-C speci
fi
cations.
2. Set the LEDs on the Advanced Cable Tester device per the pass/fail results.
Advanced Cable Tester User Manual v1.13.001
24
Содержание Advanced Cable Tester
Страница 2: ...Advanced Cable Tester User Manual v1 13 001 2...
Страница 15: ...Advanced Cable Tester User Manual v1 13 001 15...