P . 6
Wiring Method
■
Individual operation
■
Two-point operation
Be sure to consult with a TOSO representative and an electrician before installing
power cables/operation cables. In addition, hire an electrician to install and connect
cables.
Entrust the wiring and connection work to the electrical contractor.
While the connection work is underway, do not activate the power. Failure to
observe this precaution may lead to electric shock.
Caution
←
to the Power supply
VVFØ1.6x2C E1.6 (separate procedure)
VCTF0.75
□
×4C
or IPØ0.65×4C (separate procedure)
AC 100V-240V power
outlet with ground
terminal
(separate procedure)
Power cord (1 m)
→
Inlay Modular Connector (6 poles)
for single or inlay connector chip body
Modular cord (6 poles) or
Modular cord (6 poles) with terminal
←
to the Power supply
VVFØ1.6x2C E1.6 (separate procedure)
VCTF0.75
□
×4C
or IPØ0.65×4C (separate procedure)
AC 100V-240V power
outlet with ground
terminal
(separate procedure)
Power cord (1 m)
→
Inlay Modular Connector (6 poles)
for single or inlay connector chip body
Modular cord (6 poles) or
Modular cord (6 poles) with terminal
P . 6
P . 7
■
Simultaneous operation
■
Simultaneous selective operation
←
to the Power supply
VVFØ1.6x2C E1.6 (separate procedure)
VCTF0.75
□
×4C
or IPØ0.65×4C (separate procedure)
AC 100V-240V power
outlet with ground
terminal
(separate procedure)
Power cord (1 m)
→
Inlay Modular Connector (6 poles)
for single or inlay connector chip body
Modular cord (6 poles) or
Modular cord (6 poles) with terminal
←
to the Power supply
VVFØ1.6x2C E1.6 (separate procedure)
VCTF0.75
□
×4C
or IPØ0.65×4C(separate procedure)
AC 100V-240V power
outlet with ground
terminal
(separate procedure)
Power cord (1 m)
→
1
2
3
Inlay Modular Connector (6 poles)
or inlay connector chip body
Modular cord (6 poles) or
Modular cord (6 poles) with terminal
ALL
Switch
Switch
1
Switch
2
Switch
3