STANDARD MODELS
Capacity
10kVA (8.5kW)*
14kVA (11.9kW)*
18kVA (15.3kW)*
Applications
Switches
Generator compatibility
Bypass Switch
Bypass Disable
Static switch <1/4 cycle (50Hz:5ms/60Hz:4.16ms)
Automatic Retransfer
Factory or authorized service center selectable only
User Interface
Provided (can be disabled from front panel)
Real Time Clock
Schedule Operation
Standard, Minimum 3 days memory backup during power loss
RUN/STOP Disable
Schedule ON/OFF operation of UPS using communication software
Autostart
UPS has option for UPS to start automatically when AC is applied
Remote ON/OFF
Standard, external terminal
LED Display
4 LED’s indicating input/output condition, warning and battery operation
LCD Screen
16 characters x 2 lines
UPS Operation: 6 Keys
Run/Stop, Set/Monitor, Shift/Select, Del/(page down), Reset/(page up)
Buzzer Volume
Low, High, Mute; Selectable by keypad
Power Connections
Hard wire (Standard)
Emergency Power Off
Standard (Terminal contacts only)
Remote Contacts
Standard (INV, BYP, BATT, LB, AC, FLT)
RS232 ASCII Interface
Standard
Mechanical Design
Enclosure
Enclosure of unit made from sheet metal meeting NEMA1 and UL Type 1
Size (HxWxD) Inches (max)
28.25 x 13 x 33.5
39.1 x 17.5 x 34.8
39.1 x 17.5 x 34.8
Paint System
Powder coating.
Fan Panel
Panel mounted on back of UPS to allow for easy replacement of fans
without turning UPS off.
Battery System
Battery Replacement
Slide out battery packs accessible from front of UPS, factory or authorized
service center serviceable only
Battery Packs
Designed for battery acid leakage containment with (6) batteries per pack.
Battery Pack Size
(HxWxD)Inches(max)
5 x 7.3 x 18.2
Battery Pack Quantity
4
8
8
Battery Manufacturer
Enersys
Battery Type
NPX-35
Toshiba’s Part Number for
Battery Pack
51896
(*)Input/output figures rated for 240 volts. Output ratings given for 0.85PF are only valid
when the input voltage is greater than 204 volts; otherwise, ratings given for 0.70PF are
applicable.
(**)
Battery backup time may vary depending on the operating conditions and ambient
temperature at the installation site.
(***)
An initial charge time of 24 hrs. is necessary to obtain proper battery performance level
before unit is placed in operation.
(****) At 6600 ft (2000 m) above sea level, output capacity should be derated by 3%.