Upgrade
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
110
DKAdmin/DKBackup
8. Press
Enter
and then select the processor type you are upgrading to; press
Enter
after
selecting the processor (RDTU E/F, Release 3 in this example).
9. If you haven’t backed up the customer database by downloading the original RCTU,
answer
Yes
to
Backup From DK First
; otherwise, answer
No
. Press the spacebar to
make your selection and then press
Enter
.
10. From the screen in
Step 7
above, use the spacebar to change
Backup From DK First
from
No
to
Yes
to download the database from the original processor and press
Enter
.
Note
If you already completed a backup and have a spare customer database for the original
processor, you can answer
No
to the prompt:
Backup from DK First
.
DKAdmin/DKBackup upgrades the database files and displays the screen shown in
Step 13
.
Steps 11
and
12
are skipped.
You are prompted with the message
Upgrading to DK RCTU EF, R3. Are you
sure?
This database is then upgraded before sending it to the “new” processor
11. Use the arrow keys to highlight
Yes
and press
Enter
. You are now prompted with
You
will receive data FROM the DK. Are you sure?
12. Highlight
Yes
and press
Enter
. DKAdmin/DKBackup downloads the following files:
PRGALL, REPALL, NAMEALL, VIDALL, ADMEMOAL, MSGALL, CFALL
(Release 3), MWALL (Release 3), CLID (Release 3). DKAdmin/DKBackup then
upgrades and builds the database. After upgrading the database, the screen in
Step 13
displays.
13. At this point DKAdmin/DKBackup has upgraded the customer database; follow the
instructions on the screens below to change ROMs/Flash Memory on processors and add
cabinets and PCBs as required.
Important!
Remember to turn power off before changing PCBs and cabinets. Then turn the
system back on and perform the steps on the screen below to ensure the
DKBackup and DK system TTY port communication link continues to function
during the remaining upgrade process.
Processor Conversion
PLEASE READ THE FOLLOWING SCREENS AS THEY PROVIDE VERY IMPORTANT
INFORMATION REGARDING THE UPGRADE AND INITIALIZATION PROCESSES.
Please turn DK system power off and add/change cabinets, processor ROM or
RMSS memory and/or RCTU PCBs as required.
IMPORTANT: Do not add PCBs, other than RSIU or PIOU in between existing
PCBs at this time as they will make station port and/or CO line numbers
shift causing the upgraded data to be invalid.
The next screen provides step-by-step instructions for initializing the
system.
Press any key to Continue
Содержание Strata DK Backup
Страница 10: ...How To Use This Manual x DKAdmin DKBackup ...
Страница 16: ...Screen Conventions 6 DKAdmin DKBackup ...
Страница 26: ...Step 6 Connect to the Strata DK Telephone System 16 DKAdmin DKBackup ...
Страница 36: ...Step 6 Connect to the Strata DK Telephone System 26 DKAdmin DKBackup ...
Страница 44: ...Logging Off 34 DKAdmin DKBackup ...
Страница 126: ...View Print Data 116 DKAdmin DKBackup ...
Страница 136: ...System Utilities 126 DKAdmin DKBackup ...
Страница 158: ...Important Things to Do After Upgrading to an RCTUE F Processor 148 DKAdmin DKBackup ...
Страница 177: ......