DK424i Installation
Step 2: Mount Cabinets
7-16
Strata DK I&M 6/00
Wrap the cables in with the mesh tie. The purpose of the wrap is to shield the cables from EMI/RFI
effects. See
Front
Cable Shield
(B50MT)
1. Attach lead to grounding screw.
2. Wrap mesh around
communication cables.
3. Secure with velcro strap.
CAUTION!
Mesh strap should not touch
cabinet metal surfaces.
Part No. B50MT comes with the Base
Cabinet. It must be ordered separately
for each Remote Cabinet pair.
25-Pair
Amphenol
Cables
5045
To MDF
Knock Out Plastic
To
MDF
Top
25-Pair
Amphenol
Cables
Figure 7-10 Cabinet Amphenol Cables
Содержание Strata AirLink DK40i
Страница 22: ...Introduction Related Documents Media xx Strata DK I M 6 00 ...
Страница 48: ...DK14 Installation DK14 Wiring Diagrams 1 26 Strata DK I M 6 00 ...
Страница 220: ...DK424 Installation Remote Cabinet Installation Instructions 5 68 Strata DK I M 6 00 ...
Страница 262: ...DK424i Configuration Primary Reserve Power Cabinet Hardware 6 42 Strata DK I M 6 00 ...
Страница 450: ...Universal Slot PCB Wiring Option Interface PCB Wiring Diagrams 10 42 Strata DK I M 6 00 ...
Страница 592: ...Peripheral Installation Enhanced 911 Service E911 12 84 Strata DK I M 6 00 ...
Страница 616: ...ACD Installation Spectrum Electronic Wall Boards 13 24 Strata DK I M 6 00 ...
Страница 634: ...Fault Finding Fault Isolation Flowcharts 14 18 Strata DK I M 6 00 ...
Страница 704: ...ISDN Interfaces ISDN Disconnect Cause Code 16 54 Strata DK I M 6 00 ...