4-4
DECK MECHANISM DISASSEMBLY
(S10)
(S12)
(S11)
Fig.(B)
(S15)
(S15)
(S14)
(S9)
(S9)
(S9)
(C8)
(C9)
(L4)
(S13)
GEAR SLIDER
GEAR MAIN
GEAR EXCHANGE
GEAR LOADING
GEAR WHEEL MAIN
MOTOR ASSEMBLY MAIN
MOTOR ASSEMBLY MAIN
MODE SWITCH
PCB ASSEMBLY MAIN MODE
BASE MAIN
GEAR UP/DOWN
Fig.(A)
Fig.(C)
Fig. 4-4
4. Base Assembly Main(Fig. 4-4)
• Put the Base Assembly Main face down(Bottom Side).
4-1. PCB Assembly Main Mode
1)Unconnect the Connectors (C8), (C9).
2)Release three Screws(S9).
• When reassembling, align the Mode Switch position as
Fig.(A).
• Put the Base Assembly Main on original position(Top Side)
4-2. Gear Slider
1) Release Screw(S10).
4-3. Gear Exchange
1) Release Screw(S11).
4-4. Gear Main
1) Release Screw(S12).
• When reassembling, align the (A) position of the Gear Main
to the (B) position of Mode Switch as Fig.(B)
4-5. Gear Up/Down
1) Release Screw(S13).
• Reassembling, turn the Gear Up/Down in direction of arrow
as Fig.(C).
4-6. Gear Wheel Main
1) Release Screw(S14).
4-7. Gear Loading
4-8. Motor Assembly Main
1) Release 2 Screws(S15).
2) Unlock the Locking Tab(L4).
4-9. Base Main
Note
Note
Note
Note
Содержание SD-3805
Страница 62: ...3 31 3 32 7 A V CIRCUIT DIAGRAM SD 3805 2805 K615 02 03 19 R14137B ...
Страница 63: ...3 33 3 34 8 JACK CIRCUIT DIAGRAM SD 3805 2805 K615 C615 470µF 6 3V C613 1000µF 6 3V 02 03 19 R14139D T W ...
Страница 66: ...3 39 3 40 PRINTED CIRCUIT DIAGRAMS 1 MAIN P C BOARD LOCATIONGUIDE BOTTOM SIDE TOP SIDE ...
Страница 68: ...MEMO MEMO ...
Страница 74: ...MEMO ...
Страница 76: ...M E M O M E M O ...
Страница 83: ...TOSHIBA CORPORATION 1 1 SHIBAURA 1 CHOME MINATO KU TOKYO 105 8001 JAPAN ...