Replacement Procedures
Satellite U400/Satellite Pro U400/PORTEGE M800
Maintenance Manual 31
Installing the Top assembly
The following describes the procedure of installing the cover assembly.
1.
Install the
Top
assembly
to the base assembly.
NOTE: Be careful not to catch the cables between cover assembly and base assembly.
2.
Connect the
touch pad flat cable
to the connector on the system board.
3.
Secure the cover assembly with the following
screws
from the back and bottom of
computer.
•
M2.0
×
5.0 FLAT BIND screw Back x9
•
M2.5
×
8 FLAT BIND screw Back x4
4.
Free the cable from cable-drain when through the antenna cable to PCB hole.
Содержание Satellite Pro U400 Series
Страница 12: ...Satellite U400 Satellite Pro U400 PORTEGE M800 Maintenance Manual 1 1 Chapter 1 Hardware Overview ...
Страница 15: ...Chapter 1 Hardware Overview 1 2 Satellite U400 Satellite Pro U400 PORTEGE M800 Maintenance Manual ...
Страница 42: ...Satellite U400 Satellite Pro U400 PORTEGE M800 Maintenance Manual 2 1 Chapter 2 Troubleshooting Procedures ...
Страница 110: ...Test Program for Field Satellite U400 and Satellite Pro U400 Tests and Diagnostics Manual 17 ...
Страница 165: ...Satellite U400 Satellite Pro U400 PORTEGE M800 Maintenance Manual 4 i Chapter 4 Replacement Procedures ...
Страница 168: ...Replacement Procedures Satellite U400 Satellite Pro U400 PORTEGE M800 Maintenance Manual 4 iv ...
Страница 276: ...Pin Assignment 36 Satellite U400 Satellite Pro U400 PORTEGE M800 Maintenance Manual ...
Страница 302: ...Wiring Diagrams F 2 Satellite U400 Satellite Pro U400 PORTEGE M800 Maintenance Manual ...