![Toshiba RBC-RD1-PE Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/toshiba/rbc-rd1-pe/rbc-rd1-pe_installation-instructions-manual_428588009.webp)
9
System Overview
9
GB
The sensor assembly has been designed to be fitted into any standard flush or surface
mount back box. The remote sensor assembly has been built into a standard electrical
grid-plate, maximising the number of cover-plates available to the installer.
The main control unit is designed to be located just below the ceiling, beside the
indoor unit.
If solenoid valves (optional: to be supplied by the installer) are to be installed, then it
is recommended that the valves are located on the outside of the area which the
detector is protecting.
Below is a diagram of a typical installation for the RD1.
Isolating solenoid valves positioned
in the gas and liquid lines
(optional – supplied by installer)
Hotel room
FCU
FCU Interface Cable
Control
Unit
Power source
230V~50Hz
(from FCU)
Remote
sensor/audible
alarm
interconnecting
cable
Metal oxide refrigerant detector.
Low level position
K7046 Combined Installation 6/3/01 8:37 am Page 9
Содержание RBC-RD1-PE
Страница 2: ...K7046 Combined Installation 6 3 01 8 37 am Page 2 ...
Страница 70: ...70 Notes Notes Notizen Annotazioni Notas Opmerkingen K7046 Combined Installation 6 3 01 8 37 am Page 70 ...
Страница 71: ...K7046 Combined Installation 6 3 01 8 37 am Page 71 ...
Страница 72: ...MADE IN UK 1402110301 www toshiba aircon co uk K7046 Combined Installation 6 3 01 8 37 am Page 72 ...