Installation Manual August, 2011
2-1
Chapter 2 – IP
edge
Hardware
POWER REQUIREMENTS
Toshiba recommends an uninterruptible power supply (UPS) for the
IP
edge
server. A UPS is the preferred power source since it provides
automatic switch-over to 120 VAC back-up in case of a loss of power. The
specific input voltage and current requirements for each server is listed
the specifications for each model.
IP
edge
SERVERS
The IP
edge
hardware platform is available in three configurations.
•
IP
edge
EC serving up to 200 users
•
IP
edge
EM serving up to 1000 users
•
IP
edge
EP serving up to 40 users.
The EC and EM servers are both 1U rackmount chassis. The EP server
can be set on a shelf horizontally or vertically, using the optional base.
The 2U high EP chassis can be installed in a 19 inch rack using the
optional rackmount shelf adapter. Refer to
Figure 2-1 IP
edge
Server Hardware - Front View
EP Server - Up to 40 users
EC Server - Up to 200 users
EM Server - Up to 1000 users
Содержание IP edge EC
Страница 1: ...TOSHIBA Telecommunication Systems Division Installation Manual Title Page August 2011 ...
Страница 18: ...This page is intentionally left blank ...
Страница 32: ...This page is intentionally left blank ...
Страница 78: ...This page is intentionally left blank ...
Страница 82: ...This page is intentionally left blank ...
Страница 92: ...This page is intentionally left blank ...
Страница 96: ...This page is intentionally left blank ...
Страница 100: ...This page is intentionally left blank ...
Страница 144: ...This page is intentionally left blank ...
Страница 173: ...Server Based Call Manager Configuration Assign Users to User Groups Installation Manual August 2011 14 25 ...
Страница 205: ...THIS IS THE END OF THE DOCUMENT ...
Страница 206: ......